OpenConstruction Academy
Logi sisse / Registreeru
ET

Teooria enne ülesannet 3 · 9 min

VAT on the three bill parts, no separate 规费

Käibemaks kolmele jaotisele

Pärast seda loengut oskad

  1. Remove duplicate 规费 rows: social insurance and the housing fund are already in the rates.
  2. Include the provisional sum (暂列金额) in the VAT base at bid stage.
  3. Charge 9 % VAT on the total of bill items, measures and other items.
1 / 3

Where 规费 went

规费 were charges the contractor must pay by law for its workforce: social insurance and the housing provident fund. The 2013 edition and many provincial fee rules added them on the whole bill at set rates. GB/T 50500-2024 lists no 规费: the 综合单价 is the full price before tax, VAT excluded (clause 3.1.6), so these costs sit inside the rates. In this case they are in the labour day rate. A 规费 row on top counts them twice.

Näide. Old layout: bill parts + 规费 + VAT. 2024 standard: bill parts + VAT.
2 / 3

The provisional sum is in the base

The provisional sum (暂列金额) is money the client sets aside for things not yet defined; it is paid only if the client orders the work. At bid stage it still sits in 'other items' and in the VAT base, which clause 3.2.11 sets as bill items + measures + other items, so that the bid total matches the client's budget. In payment it is a different story: unused provisional sum is never paid.

Näide. Bid total = bill parts + VAT, with the provisional sum inside the bill parts.
3 / 3

VAT last

Construction services carry 9 % VAT under the general method. It is taken on the total of the three bill parts and rounded to the fen (0.01 yuan).

Näide. Bill parts 274,599.77: VAT 9 % is 24,713.98.
¥274,6001+¥24,7142¥299,3143
  • 1 Bill parts
  • 2 VAT 9 %
  • 3 Bid total

Close a bid

The bill parts are totalled. Add VAT.

Mõõtkavata
Ülesanne
  • Bill items ¥167,120.40; measures ¥87,479.37; other items: provisional sum ¥20,000.00.
  • Social insurance and the housing fund are already in the rates. VAT 9 % on the total of the three parts.
Samm 1 / 3

Bill total

Bill items + measures + other items. What is the base?

¥167,120.40 + ¥87,479.37 + ¥20,000.00 = ¥274,599.77.

Samm 2 / 3

VAT

9 % on the bill total. What is the VAT?

¥274,599.77 × 9 % = ¥24,713.98.

Samm 3 / 3

Bid total

Add it up. What is the bid total including tax?

¥274,599.77 + ¥24,713.98 = ¥299,313.75.

Lühidalt. VAT on the three bill parts, provisional sum included; no 规费 on top, they are in the rates.

Kontrolli ennast

Küsimus 1 / 3

Bill total 1,000,000.00 yuan; the rates already hold social insurance and the housing fund. A colleague adds 规费 of 3.4 % before VAT. What is the correct VAT at 9 %?

1,000,000.00 × 9 % = ¥90,000.00.
Küsimus 2 / 3

Is the provisional sum in the base for VAT at bid stage?

  • At payment, unused provisional sum is not paid; at bid it is in the base.

  • Right.

  • There is no such rule.

Küsimus 3 / 3

Which rate applies to VAT on construction services under the general method?

  • 13 % applies to goods such as materials.

  • Right.

  • 3 % is the simplified method, not the general one.