OpenConstruction Academy
Logg inn / Registrer deg
NO

Teori før oppgave 3 · 9 min

Margin is not markup

Tilbudet: margin, PC-poster, reserveposter og GST

Etter denne leksjonen kan du

  1. Say what a PC item and a provisional sum are, and put both in the price.
  2. Turn a margin on price into the markup on cost that gives it.
  3. Add GST last, once, on the whole price.
1 / 4

Allowances: PC items and provisional sums

A prime cost item is an allowance for supplying something the owners have still to choose, such as tiles or a vanity. A provisional sum is an allowance for work whose extent nobody can know yet, such as rock in the footings. Both are in the quote, so the owners see a full price. The contract says how each is adjusted once the real cost is known.

2 / 4

Margin on price, markup on cost

A margin is a share of the selling price. A markup is a percentage added to cost. They are not the same number. To reach a margin, divide the cost by (1 − margin), or mark up by margin ÷ (1 − margin).

Eksempel. On $42,000 of cost, 30% added gives $54,600 and only a 23.1% margin. A 30% margin needs a price of $60,000: a markup of 42.86%.
Markup 30% on cost: margin only 23.1%
$54,600 ($42,000 + $12,600)
Margin 30% on price: markup 42.86%
$60,000 ($42,000 + $18,000)
3 / 4

The margin goes on everything

Under this contract your margin is charged on every line, the allowances included. It pays for your overheads and profit, and those do not stop at the allowances. Read your own contract: some charge a separate margin on PC items.

4 / 4

GST last, once

GST is charged on the whole price, margin included. So it is the last row and works on the running total. A homeowner contract states the price including GST, and that is the price the legal thresholds and the deposit cap use.

Price a quote

A different job and a different margin from your task. Type your answer first.

Ikke i målestokk
Oppgaven
  • Direct cost $31,600. PC items $8,400. Provisional sums $2,000.
  • Target: a margin of 30% of the price excluding GST.
  • GST 10%, last.
Margin on price30%
Cost share of price70%
Markup on cost?
Margin on price30%
Cost share of price70%
Markup on cost42.8571%
Trinn 1 av 3

Markup on cost

What markup on cost gives a 30% margin on price? Give the percentage.

0.30 ÷ 0.70 = 0.4286, a markup of 42.86%.

+$31,6001+$8,4002+$2,0003?4?5
  • 1 Direct cost
  • 2 PC items
  • 3 Provisional sums
  • 4 Margin
  • 5 Price
+$31,6001+$8,4002+$2,0003+$18,0004$60,0005
  • 1 Direct cost
  • 2 PC items
  • 3 Provisional sums
  • 4 Margin
  • 5 Price
Trinn 2 av 3

Price excluding GST

All costs, allowances included, with that markup. What is the price?

Cost $42,000. ÷ 0.70 = $60,000.00. The margin is $18,000, which is 30% of it.

$60,0001?2?3
  • 1 Price ex GST
  • 2 GST
  • 3 Contract price
$60,0001+$6,0002$66,0003
  • 1 Price ex GST
  • 2 GST
  • 3 Contract price
Trinn 3 av 3

Price including GST

GST on the whole price. What do the owners sign for?

$60,000.00 × 1.10 = $66,000.00.

Kort sagt. Allowances in, cost divided by (1 − margin), GST last. The margin is a share of the price, not of the cost.

Test deg selv

Spørsmål 1 av 3

The owners have not chosen their kitchen benchtop yet. How is it in the quote?

  • The contract adjusts it once the real price is known.

  • A provisional sum is for work whose extent is unknown, such as rock. A benchtop is an item to choose.

  • Then the quote is not a full price and the owners cannot compare it.

Spørsmål 2 av 3

Your costs total $39,000. You want a margin of 40% of the price excluding GST. What is the price excluding GST?

39,000 ÷ 0.60 = $65,000.00. The margin of $26,000 is 40% of it.
Spørsmål 3 av 3

Where does GST go in the markups?

  • GST is charged on the whole price.

  • Then the margin is not taxed and the GST is too low.

  • GST goes on once.