OpenConstruction Academy
ورود / ثبت‌نام
FA

نظریه پیش از تکلیف 3 · 8 دقیقه

From metres to tonnes, and from net to order

وزن‌ها، تناژ و سفارش

پس از این درس می‌توانید

  1. Turn a length of bar into a weight from its diameter.
  2. Round the weight of one element, then multiply by the number of elements.
  3. Keep the bill at net weight and put the waste into the order.
1 / 5

Mass per metre comes from the diameter

  • Steel weighs about 7,850 kg per cubic metre.
  • A round bar's section is π d² ÷ 4.
  • Together: d² ÷ 162 kg per metre, d in mm.
T6: 6² ÷ 162 (kg per m)0.222
T8: 8² ÷ 162 (kg per m)0.395
T40: 40² ÷ 162 (kg per m)9.877

That is the nominal 0.00617 d². Printed tables can differ in the third decimal, so use the table your course or contract names, and use it everywhere.

2 / 5

Round one element, then multiply

  • Weigh one beam or one slab, bar size by bar size.
  • Round it once, to the stated decimals.
  • Then multiply by the number of identical elements.
One beam: 22.5 m of T40 at 9.877 kg/m (kg)222.23
Eighteen beams (kg)4,000.14

If you round only at the end the third decimal of the tonnes can move. The task states its rounding: follow it to the letter, because the bill is checked against it.

3 / 5

Mesh is weighed by the sheet

  • Mesh is bought and laid in whole sheets.
  • Its weight is sheets × sheet area × kg per m².
  • The laps are inside the sheets you counted.
Sheets laid, laps included10
Area of one sheet, 4.8 × 2.4 (m²)11.52
A193 mesh (kg per m²)3.02
Weight (kg)347.9

Mesh is named by its section, such as A193 or A252, and the data sheet gives its weight per square metre. The figures here are an example, not your task's mesh.

4 / 5

The bill is net; the order buys the waste

  • The bill measures the steel that is built in.
  • Bars come in stock lengths; the offcuts are bought too.
  • So the order adds waste to each net group.
10,000
  • Net steel, in the bill 10,000
  • Cutting waste, in the order 500

In kilograms, at 5 % on bars. Mesh is cut less and usually carries a smaller percentage. Waste is paid for once: here in the order, and later inside the supply price of the rate.

5 / 5

Three checks before you send tonnes

  • Is every bar size of the element in the sum, links included?
  • Did you multiply by every floor that has the element?
  • Is the bill net and the order with waste?

These catch the usual errors: a bar size left out, one floor counted instead of four, and waste in the wrong document.

کلیدهای جهت‌دار یا کشیدن انگشت

Weigh eighteen beams and their mesh

Different bars and counts from your task. Answers in kilograms; 1,000 kg is one tonne.

بدون مقیاس
مسئله
  • One beam: 22.5 m of T40 and 60.0 m of T8 links. There are 18 beams.
  • Mass per metre: T40 9.877 kg, T8 0.395 kg.
  • Mesh A193: 10 sheets of 4.8 × 2.4 m, 3.02 kg per m².
  • Waste for the order: 5% on bars, 2% on mesh. Weights per element to 0.01 kg.
Length (m)22.5
kg per m9.877
One beam (kg)?
Length (m)22.5
kg per m9.877
One beam (kg)222.23
گام 1 از 4

T40 in one beam

Length times kg per metre, to 0.01 kg. What does one beam's T40 weigh?

22.5 × 9.877 = 222.23 kg for one beam.

T40, all beams (kg)
?
T40, all beams (kg)
4,000.14
گام 2 از 4

T40 in all beams

Times the number of beams. What is the net weight of T40 in kg?

222.23 × 18 = 4,000.14 kg. The bill takes it in tonnes, to 3 decimals.

Sheets10
kg per m²3.02
Mesh (kg)?
Sheets10
kg per m²3.02
Mesh (kg)347.9
گام 3 از 4

The mesh

Sheets × sheet area × kg per m², to 0.01 kg. What does the mesh weigh?

10 × 11.52 m² × 3.02 = 347.9 kg.

?347.9?
  • Net bars ?
  • Net mesh 347.9
  • Waste ?
4,426.74
  • Net bars 4,426.74
  • Net mesh 347.9
  • Waste 228.3
گام 4 از 4

The order

T8 in all beams weighs 426.60 kg. Add bar waste to both bar groups and mesh waste to the mesh. What do you order, in kg?

Bars (4,000.14 + 426.6) × 1.05, mesh 347.9 × 1.02. Order 5,002.94 kg. The bill still shows the net weights.

به‌طور خلاصه. Length × kg per metre, rounded per element, times the number of elements. The bill takes the net; the order adds the waste.

خودتان را بسنجید

پرسش 1 از 3

The net weights are 14.000 t of loose bars and 2.500 t of mesh. Waste is 5 % on bars and 2 % on mesh. What is the order, in tonnes?

14.000 × 1.05 = 14.700; 2.500 × 1.02 = 2.550. Order 17.25 t.
پرسش 2 از 3

Which weight goes into the bill of quantities?

  • The bill measures what is built. Waste is a cost of buying it, carried in the order and the rate.

  • Then the employer pays for the waste twice: in the quantity and in the rate.

  • Deliveries include offcuts and stock for later floors. The bill measures the design.

پرسش 3 از 3

A beam's bars and links weigh 180.4 kg. The drawing shows it on floors 1 to 3, five on each floor. What do you multiply by?

  • That is one floor. The element repeats on three floors.

  • That is the number of floors. Each floor has five.

  • Five per floor on three floors: 15 elements.