OpenConstruction Academy
Mag-sign in / Magrehistro
FIL

Teorya bago ang gawain 1 · 10 min

Brickwork to IS 1200 Part III: volume, the 0.1 m² test, lintels

Sukatin ang brickwork: aling mga bukana ang ibinabawas

Panimula ng kurso

Pagkatapos ng lektyur na ito, magagawa mong

  1. Take the length, height and thickness of a brick wall the way IS 1200 measures them.
  2. Test each opening against 0.1 m² and deduct only the ones over it.
  3. Take embedded RCC out of the brickwork volume, because the RCC item pays for it.
1 / 3

A brick wall is paid by volume

IS 1200 (Part III), the Indian standard method of measurement for brickwork, measures brickwork in m³, but its cl. 4.1.1 takes walls one brick thick and less in m², with the thickness stated. This project's bill follows CPWD DSR practice instead: a one-brick (230 mm) wall goes in m³ and only half-brick walls in m². That is why the task measures the 230 mm wall in m³. Length is taken between the cross walls, height from the floor to the soffit of the slab or beam above, and thickness as built. The measurement book records these three figures, so anyone can check them later.

Halimbawa. A one-brick wall (230 mm) of 6.00 m by 3.00 m is 4.14 m³ before any deduction.
Length between cross walls6 m
Height, floor to slab soffit3 m
Thickness, one brick0.23 m
Gross volume, m³4.14
2 / 3

Which openings come out: the 0.1 m² test

Test each opening on its own area. Up to and including 0.1 m², nothing is deducted, and nothing is added for the extra labour of forming it. Over 0.1 m², the whole opening is deducted. Doors, windows, ventilators and archways are openings alike; the name does not matter, only the size. A small niche or pipe sleeve usually stays in.

Halimbawa. A louvre of 0.40 × 0.30 m is 0.12 m², so it comes out. A switch box of 0.20 × 0.15 m is 0.03 m² and stays in.
6 m3 m14.46 m²
  • Brickwork, measured
  • Openings over 0.1 m²: deducted
3 / 3

Lintels are paid on the RCC line

RCC lintels over doors and windows sit inside the wall, but they are concrete, and the RCC item pays for them by volume. Leave them in the brickwork and the same cubic metre is paid twice: once as masonry, once as concrete. So the brickwork volume is the net area times the thickness, less the volume of the lintels.

Halimbawa. Net area times thickness gives 3.73 m³; the lintels are 0.11 m³. The brickwork line takes 3.62 m³.
3.62
  • Brickwork line, m³ 3.62
  • RCC lintels, paid on the RCC line, m³ 0.11

Measure a staff-room wall

Another wall on another floor: 200 mm modular brick, measured in m³ like any wall one brick thick. Find what is deducted and the volume for the bill.

Hindi ayon sa sukat
Ang problema
  • Wall SW2: 9.6 m between cross walls, 3.15 m floor to slab soffit, 0.2 m thick.
  • One door 1 m × 2.1 m, two windows 1.2 m × 1.35 m, one louvre 0.5 m × 0.3 m, one cable box 0.25 × 0.25 m.
  • RCC lintels over the door and windows: 0.08 m³, paid under the RCC item.
Hakbang 1 ng 4

Gross area of one face

Length times height. What is the gross area of one face?

9.6 m × 3.15 m = 30.24 m².

Door 1.00 × 2.102.10 m²
Two windows 1.20 × 1.353.24 m²
Louvre 0.50 × 0.300.15 m²
Cable box 0.25 × 0.25not over 0.1 m², stays in
Deducted?
Door 1.00 × 2.102.10 m²
Two windows 1.20 × 1.353.24 m²
Louvre 0.50 × 0.300.15 m²
Cable box 0.25 × 0.25not over 0.1 m², stays in
Deducted5.49 m²
Hakbang 2 ng 4

Area deducted for openings

Test each opening against 0.1 m². What do the openings over it add up to?

Door 2.10 + windows 2 × 1.62 + louvre 0.15 = 5.49 m². The cable box is under 0.1 m² and stays in.

9.6 m3.15 m? m²
  • Net brickwork
  • Deducted openings
9.6 m3.15 m24.75 m²
  • Net brickwork
  • Deducted openings
Hakbang 3 ng 4

Net area of brickwork

Gross area less the deductions. What is the net area?

30.24 m² − 5.49 m² = 24.75 m².

?0.08
  • Brickwork line, m³ ?
  • RCC lintels, m³ 0.08
4.87
  • Brickwork line, m³ 4.87
  • RCC lintels, m³ 0.08
Hakbang 4 ng 4

Volume for the bill

Net area times thickness, less the lintels. How many m³ go on the brickwork line?

24.75 m² × 0.2 m = 4.95 m³, less 0.08 m³ of lintels = 4.87 m³.

Sa madaling salita. One face, gross; take off each opening over 0.1 m²; multiply by the thickness; take the RCC out. Four figures, each one the Engineer-in-Charge can check in the measurement book.

Subukin ang sarili

Tanong 1 ng 3

A brick wall has a ventilator of 0.40 × 0.30 m and an electrical box of 0.20 × 0.15 m. What do you deduct from the brickwork?

  • The box is 0.03 m². Openings up to 0.1 m² are not deducted from brickwork.

  • Right. It is 0.12 m², over the threshold; the box is under it.

  • The type of opening does not matter, only its area. 0.12 m² is over 0.1 m².

Tanong 2 ng 3

Why does the brickwork volume leave out the RCC lintels?

  • Right. Left in, the same volume would be paid twice.

  • The 0.1 m² test is for openings, by area. Lintels come out whatever their size, because another item pays for them.

  • One face gives the area; the volume still includes everything inside the wall unless another item pays for it.

Tanong 3 ng 3

A 230 mm brick wall is 7.20 m between cross walls and 3.10 m to the slab soffit. It has one door 1.00 × 2.10 m, one window 1.50 × 1.00 m and one duct opening 0.25 × 0.30 m. No lintels. What is the brickwork volume in m³?

22.32 − 2.10 − 1.50 = 18.72 m². The duct stays in. 18.72 × 0.23 = 4.31 m³.