Ashbrook 移交:运维资料、资产数据、缺陷与保留金
移交 Ashbrook:汇编运维(O&M)手册和资产信息包,在从 PIM 向 AIM 移交前对照业主的 AIR 检查 COBie 资产数据,为竣工(Completion)关闭遗留问题,让缺陷责任登记册走完缺陷期,并按 NEC4 结清缺陷证书(Defects Certificate)和最终保留金。
英国 · English
- 5 个任务
- 3.0 小时学习
- 结业证书

本课程面向谁


为本案例虚构的人物与公司
您将完成的工作
学完后您将能够
学习成果和技能以英文发布。
- Review O&M manuals and the building log book for handover
- Check COBie asset data against the client's AIR before the PIM to AIM transfer
- Close out snags for Completion and run the defects liability register
- Settle the Defects Certificate and the final retention
核验的技能
- Assemble and review O&M manuals and the building log book
- Check COBie asset data against the client's AIR
- Prepare the PIM to AIM transfer (ISO 19650)
- Close out snags for Completion
- Run a defects liability register through the defects period
- Settle the Defects Certificate and the final NEC4 X16 retention
任务

- 1运维手册和资产信息包Closeout
- 2对照 AIR 检查 COBie 资产数据Inspections
- 3为竣工关闭遗留问题Punch list
- 4缺陷责任登记册Defects
- 5缺陷证书和最终保留金Defects
证书
您使用的文件
报名后即在你的 OpenConstructionERP 工作区中创建。
- Projects项目
- Parties各方4 条记录
- Contracts合同
开始之前
建议先修:
常见问题
课程需要多长时间?
5 个任务 · 3.0 小时学习
课程免费吗?
全部 5 项任务免费
可以获得证书吗?
全部 5 个任务通过数值、溯源和解释核验后颁发。