OpenConstruction Academy
Sign in / Register
EN

Pro · first 1 of 5 tasks freeIntermediatePre-tender

AI-assisted take-off: verify before you price

Professional course, about 4.5 h, five tasks on the fit-out of the fictional Larkfield Health Centre.

Pricing will be announced when the programme opens.

  • Netherlands · English
  • 5 tasks
  • 4.5 h of study
  • Professional certificate
Workspace: AI-assisted take-off: verify before you price
Measure the area the AI claimed

Who this course is for

Quantity surveyor — Invented character and company, drawn for this case
Your role in the caseQuantity surveyor
Meridian Build Partners — Invented character and company, drawn for this case
The company in the caseMeridian Build PartnersMain contractor

Invented character and company, drawn for this case

What you will do

An AI take-off draft has been loaded into the bill; you verify it against the drawing in the ERP's PDF takeoff. Set the scale of a half-size copy, review the AI's room proposals one by one, re-measure partitions it measured face by face, catch a miscounted door type, a missed window and a hallucinated rooflight, and fix two unit errors before signing off. Every check reads your work in the ERP; none depends on a language model.

Task steps: AI-assisted take-off: verify before you price
Scale first: an A3 copy of an A1
Check result: AI-assisted take-off: verify before you price
Four of five figures match

You will be able to

Skills checked

  • Set and check the scale of a drawing copy before measuring
  • Review AI take-off proposals one by one and reject what is not an item
  • Re-measure partitions by centreline where the AI measured faces
  • Catch miscounted, missing and hallucinated items in an AI count
  • Find unit errors and sanity-check a bill before sign-off

Tasks

Quantity surveyor — Invented character and company, drawn for this case
A day on this course
  1. 1Scale first: an A3 copy of an A1 drawing, and the area the AI chosePDF takeoffFree
  2. 2Review the AI's room proposals: accept rooms, reject everything that is not a roomPDF takeoff
  3. 3Partitions: the AI measured both facesPDF takeoff
  4. 4Counts: a tag that is not a D1, a window it missed, rooflights that do not existPDF takeoff
  5. 5Units and sign-off: square metres for a length, millimetres for metresPDF takeoff

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

4.5 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties2 records
  • BOQbill of quantities13 lines
  • Documentsdrawings and model2 files

The Ashbrook Community Health Centre tender set: drawings with revisions and a model, the same files a contractor's tender team receives.

Sheet A-101 rev B
Sheet A-101 rev B

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

5 tasks · 4.5 h of study

Is it free?

Pro · first 1 of 5 tasks free. Pricing will be announced when the programme opens.

Do I get a certificate?

Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

Join the waitlist

What's included

  • 16 professional courses on one building, 80 checked tasks
  • A professional certificate for each course and 4 track certificates
  • The full tender set: drawings with revisions and a model
  • The first 1 tasks of every course are free now

Pricing will be announced when the programme opens.

Leave your email. We will write once, when enrolment opens.

Questions or ideas? Write to info@datadrivenconstruction.io

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 5Pro · first 1 of 5 tasks free · 4.5 h of study

Start the free tasks