Construction processes

The 21 processes a construction project runs on, from the first cost plan to handover. Each page says what the process produces, who does it, how it runs in different countries and where it lives in OpenConstructionERP.

1Define

Scope, budget, WBS and cost codes are set before design starts.

  • Project setup, WBS and cost codes

    Set up the project, its work breakdown and cost codes so every cost lands in the right place.

    Documents
    • Work breakdown structure (WBS)
    • Cost code structure
    • Project directory
    Standards and references
    • ISO 21511
    • Uniclass
    • OmniClass
    • CSI MasterFormat
    • DIN 276
    • CoursesCourse in preparation
    • Free videos6 videos

2Design

Discipline models are coordinated and the carbon of design options is compared.

3Estimate

Quantities are measured, priced and backed by cost data.

4Procure

Packages are tendered, contracts signed and materials ordered.

5Plan

The programme and the risk register are set before work starts.

6Build

Cost, changes, payments, quality, safety and site records are run during construction.

7Handover

As-built data, manuals and the asset register pass to the owner.