OpenConstruction Academy
Sign in / Register
EN

Pro · first 1 of 4 tasks freeAdvancedDesign coordination before door ordering

IDS 1.0 and BCF 3.0: check model data, raise and close issues

Advanced course, about 3.5 h, four tasks on a fictional IFC 4.3 model of the Kestrel Point Learning Centre.

Pricing will be announced when the programme opens.

  • Netherlands · English
  • 4 tasks
  • 3.5 h of study
  • Professional certificate
Workspace: IDS 1.0 and BCF 3.0: check model data, raise and close issues
Import the door fire-rating IDS

Who this course is for

BIM coordinator — Invented character and company, drawn for this case
Your role in the caseBIM coordinator
Meridian Build Partners — Invented character and company, drawn for this case
The company in the caseMeridian Build PartnersContractor's BIM team

Invented character and company, drawn for this case

What you will do

Write a buildingSMART IDS 1.0 file for door fire ratings and import it, evaluate it on the model's doors (exact values, property sets, data types, cardinality), raise BCF 3.0 issues that select the exact door by GlobalId, and verify the architect's BCF reply before you close or reopen each issue. You are the BIM coordinator of the main contractor. Every count comes from the model data, and every typical slip has a name.

Check result: IDS 1.0 and BCF 3.0: check model data, raise and close issues
Check every IDS facet the ERP stored

You will be able to

Skills checked

  • Write an IDS 1.0 specification: entity applicability, property facet, data type, cardinality and allowed values
  • Import an IDS into OpenConstructionERP and read the requirements it stores
  • Evaluate IDS requirements on IFC property sets: exact values, property sets, data types, required and optional
  • Raise BCF 3.0 issues from the model viewer that select the exact element by its IFC GlobalId
  • Verify an architect's BCF reply and close or reopen each issue with a reason

Tasks

BIM coordinator — Invented character and company, drawn for this case
A day on this course
  1. 1Write the door fire-rating IDS and import itBIM requirements (IDS)Free
  2. 2Evaluate the IDS on the door data and add a second specificationBIM requirements (IDS)
  3. 3Raise one BCF issue per failing door from the modelBCF issues
  4. 4Import the architect's BCF reply and close or reopen each issueBCF issues

Certificate

Awarded when all 4 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

3.5 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties3 records
  • Documentsdrawings and model3 files

The Ashbrook Community Health Centre tender set: drawings with revisions and a model, the same files a contractor's tender team receives.

Sheet A-101 rev B
Sheet A-101 rev B

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

4 tasks · 3.5 h of study

Is it free?

Pro · first 1 of 4 tasks free. Pricing will be announced when the programme opens.

Do I get a certificate?

Awarded when all 4 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

Join the waitlist

What's included

  • 16 professional courses on one building, 80 checked tasks
  • A professional certificate for each course and 4 track certificates
  • The full tender set: drawings with revisions and a model
  • The first 1 tasks of every course are free now

Pricing will be announced when the programme opens.

Leave your email. We will write once, when enrolment opens.

Questions or ideas? Write to info@datadrivenconstruction.io

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 4Pro · first 1 of 4 tasks free · 3.5 h of study

Start the free tasks