OpenConstruction Academy
Sign in / Register
EN

Pro · first 2 of 6 tasks freeFoundation

From drawing to price: Ashbrook takeoff

Quantity takeoff for a two-storey health centre from PDF, DWG and IFC, measured to NRM2-style rules and priced from the cost database.

Pricing will be announced when the programme opens.

  • United Kingdom · English
  • 6 tasks
  • 4.5 h of study
  • Professional certificate
Workspace: From drawing to price: Ashbrook takeoff
Record room areas from Rev B

Who this course is for

Estimator / quantity surveyor — Invented character and company, drawn for this case
Your role in the caseEstimator / quantity surveyor
Ashbrook contractor — Invented character and company, drawn for this case
The company in the caseAshbrook contractorMain contractor

Invented character and company, drawn for this case

What you will do

Every number is rechecked against the Ashbrook answer ledger, and every typical wrong answer names the trap behind it.

Task steps: From drawing to price: Ashbrook takeoff
Read the drawing set
Check result: From drawing to price: Ashbrook takeoff
Use the current revision

You will be able to

  • Read a drawing set: current revision, scale, superseded sheets
  • Measure PDF, DWG and IFC to stated NRM2-style rules
  • Reconcile model quantities with rule quantities
  • Price measured quantities from the cost database

Skills checked

  • Read a drawing register and revisions
  • Measure PDF/DWG/IFC to stated rules
  • Deduct openings and voids by threshold
  • Reconcile IFC quantities with rule quantities
  • Convert cost-database units to bill units

Tasks

Estimator / quantity surveyor — Invented character and company, drawn for this case
A day on this course
  1. 1Read the set: sheets, scales, revisionsDocumentsFree
  2. 2PDF takeoff: room areas and skirtingPDF takeoffFree
  3. 3DWG takeoff: walls by layer, net of openingsDWG takeoff
  4. 4BIM takeoff: walls and slabs from IFC, reconciledBIM hub
  5. 5Quantity rules: from measured to billedBOQ
  6. 6Price it: cost database to section totalCost database

Certificate

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

4.5 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties2 records
  • BOQbill of quantities16 lines

The Ashbrook Community Health Centre tender set: drawings with revisions and a model, the same files a contractor's tender team receives.

DXF 5IFC 1PDF 7

Sheet A-101 rev B
Sheet A-101 rev B
Sheet A-300 rev A
Sheet A-300 rev A
Sheet A-610 rev B
Sheet A-610 rev B

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

6 tasks · 4.5 h of study

Is it free?

Pro · first 2 of 6 tasks free. Pricing will be announced when the programme opens.

Do I get a certificate?

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

Join the waitlist

What's included

  • 16 professional courses on one building, 80 checked tasks
  • A professional certificate for each course and 4 track certificates
  • The full tender set: drawings with revisions and a model
  • The first 1 tasks of every course are free now

Pricing will be announced when the programme opens.

Leave your email. We will write once, when enrolment opens.

Questions or ideas? Write to info@datadrivenconstruction.io

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 6Pro · first 2 of 6 tasks free · 4.5 h of study

Start the free tasks