All 5 tasks freeIntermediateNEC4 ECC Option B
Quality and handover on Ashbrook: inspections to closeout
Run quality and handover on Ashbrook: an inspection and test plan with hold points for the EW1 cavity, a nonconformance report priced from the window schedule, an RFI that becomes a Scope change, the pre-handover punch list, and the closeout package with the CDM 2015 health and safety file, ISO 19650 information handover and NEC4 retention release.
United Kingdom · English
- 5 tasks
- 3.0 h of study
- Certificate of completion

Who this course is for


Invented character and company, drawn for this case
What you will do
You will be able to
- Plan inspections from an ITP
- Raise and close an NCR with root cause
Skills checked
- Plan inspections with hold points from an ITP
- Raise and price an NCR
- Turn an RFI response into a costed Scope change
- Run a punch list to Completion
- Assemble a closeout package (CDM 2015 H&S file, ISO 19650 handover)
- Work out NEC4 X16 retention release
Tasks

- 1Inspection and test plan for the EW1 cavityInspectionsWatch 3 min
- 2NCR: missing cavity closersNCRWatch 3 min
- 3RFI on the IW2 head detail and its costRFI
- 4Snagging before CompletionPunch listWatch 3 min
- 5Handover package: H&S file, information and retentionCloseout
Certificate
Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- project
- parties4 records
- contract
Before you start
No other course is needed first. You can start with this one.
Questions
How long does the course take?
5 tasks · 3.0 h of study
Is it free?
All 5 tasks free
Do I get a certificate?
Awarded when all 5 tasks pass the numbers, trace and explain checks.
Questions about this course? Write to info@datadrivenconstruction.io


OpenConstruction Academy