OpenConstruction Academy
Sign in / Register
EN

All 5 tasks freeFoundationОбществена поръчка за строителство по ЗОП

Quantity schedule (количествена сметка) and priced BoQ (КСС): a school in Belosten

A free introductory course of about 1 h 45 min, five tasks on a fictional case: a school with energy-efficiency measures.

  • Bulgaria · Български
  • 5 tasks
  • 3.0 h of study
  • Certificate of completion
Workspace: Quantity schedule (количествена сметка) and priced BoQ (КСС): a school in Belosten
Enter the net facade area

Who this course is for

Junior pricing engineer — Invented character and company, drawn for this case
Your role in the caseJunior pricing engineer
Балкантерм Строй ЕООД — Invented character and company, drawn for this case
The company in the caseБалкантерм Строй ЕООДMain contractor

Invented character and company, drawn for this case

What you will do

You will measure façade, windows, reveals, roof and painting from dimensions and specifications, with clear rules for deducting openings, assemble the priced bill of quantities (КСС) in the ERP (quantity × unit rate, sections, total, VAT (ДДС) shown separately) and check a draft for typical errors. You are a junior pricing engineer at Balkanterm Stroy EOOD. It prepares you for the paid course “Belosten School: BoQ (КСС), Form 19 certificate (акт обр.) and unforeseen construction works”.

Task steps: Quantity schedule (количествена сметка) and priced BoQ (КСС): a school in Belosten
Follow the five task steps
Check result: Quantity schedule (количествена сметка) and priced BoQ (КСС): a school in Belosten
Deduct the openings correctly

You will be able to

Skills checked

  • Measures facade, roof and interior finish areas from dimensions with stated deduction rules
  • Derives window areas and reveal lengths from a window schedule in the correct units
  • Builds a sectioned bill of quantities (КСС) in OpenConstructionERP: quantity x unit price, section totals, VAT kept separate
  • Checks a draft bill of quantities for unit errors, double counting and VAT inside unit prices
  • Explains why Bulgarian measurement conventions must be written into the quantity schedule

Tasks

Junior pricing engineer — Invented character and company, drawn for this case
A day on this course
  1. 1Façade: insulation area from the dimensions minus openingsBOQ
  2. 2Windows and reveals from the specificationBOQ
  3. 3Roof and interior painting: areas and the deduction ruleBOQ
  4. 4Checking the draft: units, double counting, VAT (ДДС) in the priceBOQ
  5. 5Assembling the BoQ (КСС) in the ERP: quantity × unit rate, sections, totalBOQ

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks.

3.0 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties2 records
  • BOQbill of quantities10 lines

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

5 tasks · 3.0 h of study

Is it free?

All 5 tasks free

Do I get a certificate?

Awarded when all 5 tasks pass the numbers, trace and explain checks.

Start free course All courses

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 5All 5 tasks free · 3.0 h of study

Start free course