OpenConstruction Academy
Sign in / Register
EN

All 4 tasks freeIntermediate

Gymnasium in Belosten: ZUT and Acts under Ordinance No. 3 for a New Building

Professional course, about 2.5 h, four tasks on a fictional case: a new gymnasium for a municipal school, category III.

  • Bulgaria · Български
  • 4 tasks
  • 3.0 h of study
  • Certificate of completion
Workspace: Gymnasium in Belosten: ZUT and Acts under Ordinance No. 3 for a New Building
Record the controlled-level checks

Who this course is for

Technical manager — Invented character and company, drawn for this case
Your role in the caseTechnical manager
Балкантерм Строй ЕООД — Invented character and company, drawn for this case
The company in the caseБалкантерм Строй ЕООДMain contractor

Invented character and company, drawn for this case

What you will do

You are the technical manager at Балкантерм Строй ЕООД. You register the controlled levels under section III of the Form 2 protocol, reflect the suspension by the Form 10 act and the resumption by the Form 11 act in the schedule, accept the structure with separate Form 7 acts for formwork, reinforcement and welds, and classify the deviations from the design under Art. 154 ZUT (Spatial Development Act).

Task steps: Gymnasium in Belosten: ZUT and Acts under Ordinance No. 3 for a New Building
Follow the five task steps
Check result: Gymnasium in Belosten: ZUT and Acts under Ordinance No. 3 for a New Building
Give the deviation in centimetres

You will be able to

Skills checked

  • Records controlled-level checks of Form 2 section III (Ordinance No. 3) as inspections with pass/fail results
  • Schedules a suspension between Form 10 and Form 11 acts and restarts works only after Form 11
  • Registers separate Form 7 acts for formwork, reinforcement and welding per structural element
  • Classifies design deviations under Art. 154 of the Spatial Development Act (ZUT): inadmissible, permit amendment, non-substantial
  • Explains which Ordinance No. 3 forms are mandatory for a category III building

Tasks

Technical manager — Invented character and company, drawn for this case
A day on this course
  1. 1Form 2 protocol, section III: controlled levels of excavation and plinthInspections
  2. 2Foundation soil, suspension with Form 10 and resumption with Form 11Schedule
  3. 3Form 7 act: formwork, reinforcement and welds separatelyInspections
  4. 4Deviations from the design under Art. 154 ZUTRFI

Certificate

Awarded when all 4 tasks pass the numbers, trace and explain checks.

3.0 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties3 records

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

4 tasks · 3.0 h of study

Is it free?

All 4 tasks free

Do I get a certificate?

Awarded when all 4 tasks pass the numbers, trace and explain checks.

Start free course All courses

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 4All 4 tasks free · 3.0 h of study

Start free course