OpenConstruction Academy
Sign in / Register
EN

Pro · first 1 of 4 tasks freeIntermediate

Haselmoor lot 05: measurement, change orders and final account under VOB/B

Professional course, about 2 hours, four tasks on an invented case with real practice: billing the external insulation system of an administration building under VOB/B.

Pricing will be announced when the programme opens.

  • Germany · Deutsch
  • 4 tasks
  • 3.0 h of study
  • Professional certificate
Workspace: Haselmoor lot 05: measurement, change orders and final account under VOB/B
Read the X31 measurement in

Who this course is for

Site manager and billing — Invented character and company, drawn for this case
Your role in the caseSite manager and billing
Brehmer Fassadentechnik GmbH — Invented character and company, drawn for this case
The company in the caseBrehmer Fassadentechnik GmbHSpecialist subcontractor

Invented character and company, drawn for this case

What you will do

You are the contractor's site manager: you read the joint measurement as GAEB X31 and edit the bill, price a quantity overrun above 10 % under § 2 (3), work out a change order under § 2 (5) and post it to the contract, and draw up the final account with retention under §§ 14, 16 and 17. Every figure is checked against the ERP or the ledger. Task 1 is free.

Task steps: Haselmoor lot 05: measurement, change orders and final account under VOB/B
Follow the five task steps
Check result: Haselmoor lot 05: measurement, change orders and final account under VOB/B
Base the overrun on the bill

You will be able to

Skills checked

  • Read a joint measurement (GAEB X31) into the contract bill as billing quantities
  • Reprice a quantity overrun above 110 % under VOB/B § 2 (3) from the deposited original estimate
  • Price a change order under VOB/B § 2 (5) as an add-on rate and post it to the contract
  • Prepare a final account with a defects security retention under VOB/B §§ 14, 16 and 17

Tasks

Site manager and billing — Invented character and company, drawn for this case
A day on this course
  1. 1Read the joint measurement as GAEB X31DocumentsFree
  2. 2Overrun above 10 %: new price under VOB/B § 2 (3)BOQ
  3. 3Change order under VOB/B § 2 (5): 200 instead of 160 mm insulationVariations
  4. 4Final account and retentionBOQ

Certificate

Awarded when all 4 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

3.0 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • Documentsdrawings and model1 file
  • parties3 records
  • BOQbill of quantities12 lines
  • contract

The Ashbrook Community Health Centre tender set: drawings with revisions and a model, the same files a contractor's tender team receives.

Sheet A-101 rev B
Sheet A-101 rev B

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

4 tasks · 3.0 h of study

Is it free?

Pro · first 1 of 4 tasks free. Pricing will be announced when the programme opens.

Do I get a certificate?

Awarded when all 4 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

Join the waitlist

What's included

  • 16 professional courses on one building, 80 checked tasks
  • A professional certificate for each course and 4 track certificates
  • The full tender set: drawings with revisions and a model
  • The first 1 tasks of every course are free now

Pricing will be announced when the programme opens.

Leave your email. We will write once, when enrolment opens.

Questions or ideas? Write to info@datadrivenconstruction.io

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 4Pro · first 1 of 4 tasks free · 3.0 h of study

Start the free tasks