OpenConstruction Academy
Sign in / Register
EN

Pro · first 2 of 6 tasks freeFoundation

Hollis Yard: wood-frame multifamily takeoff to schedule of values

Take off a 60-unit, four-story Type V-A wood-frame apartment building over a concrete podium from a PDF and DWG drawing set: walls by type, gypsum board, batts, sheathing, studs and treated plates by stated rules.

Pricing will be announced when the programme opens.

  • United States · English
  • 6 tasks
  • 5.0 h of study
  • Professional certificate
Workspace: Hollis Yard: wood-frame multifamily takeoff to schedule of values
Read the bid set

Who this course is for

Estimator — Invented character and company, drawn for this case
Your role in the caseEstimator
Tull Builders — Invented character and company, drawn for this case
The company in the caseTull BuildersSelf-performing contractor

Invented character and company, drawn for this case

What you will do

Build unit costs from burdened labor hours, material with waste and sales tax, and equipment, then close the bid and turn it into the owner's schedule of values in the G703 continuation-sheet layout. Every figure is rechecked against the Hollis Yard ledger, and every typical estimator mistake is named. G702/G703 and A101/A201 are AIA document names; the course is not affiliated with the AIA and reproduces no AIA form text.

Task steps: Hollis Yard: wood-frame multifamily takeoff to schedule of values
Enter the control figures
Check result: Hollis Yard: wood-frame multifamily takeoff to schedule of values
Count wood-frame levels only

You will be able to

Skills checked

  • Take off wood-frame walls by type from PDF and DWG with stated measurement rules and addenda
  • Convert wall LF to gypsum board, batts, sheathing, studs and treated plates with waste handled once
  • Build unit costs from burdened labor hours, material with waste and sales tax, and equipment
  • Turn a bid into an owner schedule of values in the AIA G703 layout

Tasks

Estimator — Invented character and company, drawn for this case
A day on this course
  1. 1Read the bid set: levels, units, addendumDocumentsFree
  2. 2PDF takeoff: exterior and corridor wallsPDF takeoffFreeWatch 7 min
  3. 3DWG takeoff: demising walls and unit partitionsDWG takeoff
  4. 4From wall LF to board, batts, sheathing and studsBOQ
  5. 5Unit-cost build-up: labor x rate + material + equipmentBOQ
  6. 6Contract sum and the owner's schedule of values (G703 style)BOQWatch 4 min

Certificate

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

5.0 h of study

Certificates →

Sample layout. Your certificate shows your name, the course version, the date and a verification ID.

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • project
  • parties3 records
  • BOQbill of quantities30 lines

The Ashbrook Community Health Centre tender set: drawings with revisions and a model, the same files a contractor's tender team receives.

DXF 4PDF 7

Sheet A-101 rev B
Sheet A-101 rev B
Sheet A-300 rev A
Sheet A-300 rev A
Sheet A-610 rev B
Sheet A-610 rev B

Before you start

No other course is needed first. You can start with this one.

Questions

How long does the course take?

6 tasks · 5.0 h of study

Is it free?

Pro · first 2 of 6 tasks free. Pricing will be announced when the programme opens.

Do I get a certificate?

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

Join the waitlist

What's included

  • 16 professional courses on one building, 80 checked tasks
  • A professional certificate for each course and 4 track certificates
  • The full tender set: drawings with revisions and a model
  • The first 1 tasks of every course are free now

Pricing will be announced when the programme opens.

Leave your email. We will write once, when enrolment opens.

Questions or ideas? Write to info@datadrivenconstruction.io

Questions about this course? Write to info@datadrivenconstruction.io

Start free: task 1 of 6Pro · first 2 of 6 tasks free · 5.0 h of study

Start the free tasks