Site levels: platform, cut and fill, building corners

You are the land surveyor on a fictional 2.4 ha development plot. Groundworks start next week. In five tasks you read the ground from spot levels, put the building platform on it, find the level that needs no lorries, fix the building corners from the boundary and check the crew's stakes.

Start task 1

Open, gently sloping ground on the edge of a town, survey pegs and a tripod in the foreground, no buildings yet.Fictional project
Development plot with stockpile areaOpen ground before the groundworks
Plot
Development plot, five corners, street on the south side
Coordinates
Projected grid, metres; levels in metres
Method
Ground surface, design pad, cut and fill, polar setting out, stake check
Work in the ERP
5 tasks, about 1 h 52 min

Who hands what to whom

Every arrow is a figure that reaches your desk or leaves it, and the task where that happens.

Comes to you

  • Site managerAsks for levels and corners
    • FallTask 1
    • No lorriesTask 3
  • Setting-out crewStakes the corners
    • StakesTask 5
YouLand surveyor

Goes from you

    • Cut and fillTask 2
    • Platform levelTask 3
    Earthworks contractorDigs and fills
    • SetbackTask 4
    ClientBuilding on its plot

Your route through the job

From the ground to the pegs. Every task is free.

  1. Levels

    Task 1 · 12 min

    Read the ground from spot levels

    You produce
    Fall of the ground
    Document
    Ground surface
    In the ERP
    Volumes
  2. Levels

    Task 2 · 25 min

    Platform at 412.000: cut and fill

    You produce
    Cut and fill
    Document
    Volume
    In the ERP
    Volumes
  3. Levels

    Task 3 · 25 min

    The level that balances

    You produce
    Balanced level
    Document
    Volume
    In the ERP
    Volumes
  4. Setting out

    Task 4 · 25 min

    Corners from the boundary

    You produce
    Building corners
    Document
    Saved points
    In the ERP
    Calculations
  5. Setting out

    Task 5 · 25 min

    Stake, check and decide

    You produce
    Stake check
    Document
    Setting-out record
    In the ERP
    Setting-out

How the ground becomes a building on pegs

Each step below is one task, in the order the site needs it.

Ground
Task 1GroundPoints to surface.
Volume
Task 2PadCut and fill.
Level
Task 3BalanceCompacted cut = fill.
Points
Task 4CornersBearing and distance.
Check
Task 5StakesMeasured against design.

Blue is what the task adds; grey is carried over from before.

In short. Take every level and corner from the one survey, and check every peg against its design.