OpenConstruction Academy
Sign in / Register
EN

All 5 tasks freeIntermediate2 h of studyInternational

Site levels: platform, cut and fill, building corners

On a fictional 2.4 ha development plot.

Who it's for Land surveyor on the development plot (levels, platform, setting out; ISO 4463)

Workspace: Site levels: platform, cut and fill, building corners
Read the ground from spot levels

You will be able to

Skills checked

  • Build a ground surface from a grid of spot levels and read the fall across it (ISO 4463-1)
  • Compute cut and fill for a building platform and the compacted fill that is still short
  • Find the platform level at which the compacted cut balances the fill
  • Fix building corners from a boundary monument by bearing and distance and check the street setback (ISO 4463-1)
  • Check setting-out stakes against a 10 mm tolerance and by a diagonal, and raise an NCR draft for a stake that fails (ISO 4463-1)

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: Read the ground from spot levels
  1. 1
    Read the ground from spot levelsFoundation≈12 minTheory · 5 min
  2. 2
    Platform at 412.000: cut and fillFoundation≈25 minTheory · 7 min
  3. 3
    The level that balancesFoundation≈25 minTheory · 7 min
  4. 4
    Corners from the boundary≈25 minsurvey_coreTheory · 7 min
  5. 5
    Stake, check and decideFoundation≈25 minsetting-outTheory · 6 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks.

Certificates

Sample: Certificate of completion
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties3 records

Start free course All courses

What next

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 5All 5 tasks free · 2 h of study

Start free course