Land parcels: boundary, area, overlap, split and register
On a fictional development plot of about 2.4 ha.
Who it's for Site surveyor

You will be able to
Skills checked
- Find a mistyped boundary corner by comparing the computed area with the legal area (ISO 19152-1)
- Turn grid lengths into ground lengths with the combined scale factor and set out a point by polar (ISO 19111)
- Measure an overlap with a neighbouring parcel and fix the shared corner from the field evidence (ISO 19152-1)
- Split a parcel to a set area parallel to a side and give the new lot's depth
- Record ownership and an easement on a new lot and work out the easement's area (ISO 19152-1)
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Write the register entry: who holds whatFoundation≈25 minTheory · 6 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties2 records
What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses

Your roleContractor's quantity surveyor
Interim payment under FIDIC: retention, IPC, late payment
On a fictional six-storey mixed-use building in its eleventh month.
Intermediate1.5 h of studyFigures checked 11EN
All 5 tasks freeCertificate of completion
Your roleQuality manager of the main contractorQuality control: hold point, NCR, RFI to taking-over
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Intermediate1.5 h of studyFigures checked 9EN
All 5 tasks freeCertificate of completion
Your roleLand surveyor on the development plotSite levels: platform, cut and fill, building corners
On a fictional 2.4 ha development plot.
Intermediate2 h of studyFigures checked 16EN
All 5 tasks freeCertificate of completion