OpenConstruction Academy
Sign in / Register
EN

Theory before task 3 · 7 min

Shared boundaries and overlaps

The neighbour's corner is inside our plot

After this lecture you can

  1. Explain why neighbouring parcels share corner points.
  2. Measure a point's offset from a boundary line.
  3. Compute the area of a thin overlap.
1 / 3

One boundary, not two lines

Two parcels that meet share their boundary. In a clean register the shared corners are the same points with the same coordinates in both parcels. When one record holds its own slightly different corner, the two boundaries cross and leave a sliver claimed twice, or a gap claimed by nobody.

Example. A neighbour's corner 0.5 m inside a 100 m side makes a sliver of 25 m².
Side length, m100.0 m
Offset of the wrong corner, m0.5 m
Sliver, half of side × offset, m²25.00 m²
2 / 3

Chainage and offset

To see how far a point lies from a line, measure along the line (the chainage) and square to it (the offset). COGO gives both from three points: A and B on the line, C the point. The sign of the offset only tells the side.

Example. Offset −0.50 m: 0.50 m to the left of A to B.
C2, shared with N1C3N4 as recordedOffsetChainage along C2 to C3Development plotNeighbour plot (east)Overlap: claimed twiceOffset drawn many times wider than it is
The overlap is a triangle: it has no width at C2.
Common mistake

A rectangle for a triangle

When one end of the shared side is common to both parcels, the overlap has no width there and grows to the offset at the other end. It is a triangle. Side × offset counts it twice.

Example. 100 m × 0.5 m = 50 m² is twice the true 25 m².

Sliver on another boundary

Different numbers from your task.

Not to scale
The problem
  • Shared side 90.0 m; the neighbour's far corner lies 0.6 m inside; the near corner is shared.
Step 1 of 1

Overlap

Area of the overlap, m²?

90.0 m × 0.6 m ÷ 2 = 27.00 m².

In short. Shared corner at one end: overlap = ½ × side × offset.

Check yourself

Question 1 of 2

COGO reports an offset of −0.42 m. How far is the point from the line?

  • Right: the sign gives the side.

  • A distance has no sign.

  • Nothing doubles here.

Question 2 of 2

Which corner moves when the field book proves your corner?

  • Right.

  • The evidence stands.

  • Splitting the difference is not a survey.

Read the source

Free official texts. The lecture cites clause numbers and puts the rules in its own words.