OpenConstruction Academy
Sign in / Register
EN

Theory before task 2 · 7 min

Grid and ground distances

Grid or ground: the length the tape shows

After this lecture you can

  1. Tell a grid distance from a ground distance.
  2. Build the combined scale factor from point scale and height.
  3. Convert a coordinate distance into the length a tape reads.
1 / 3

Why the map is not the ground

Projected coordinates such as UTM put the curved earth on a flat grid. The projection stretches or shrinks distances by a point scale factor that changes across the zone: below 1 near the central meridian, above 1 near the edges. On top of that, the site lies above the ellipsoid, so a length on the ground is a little longer than the same length on the ellipsoid.

Example. Near a UTM central meridian the point scale is about 0.9996: 1,000 m on the ground at sea level is 999.6 m on the grid.
On the ground: what the tape readsOn the ellipsoid, 412 m lowerOn the map grid: from the coordinates× height factor× point scaleC1C2Lengths drawn far apart; the real difference is centimetres
Grid length = ground length × combined factor.
2 / 3

One factor for the site

Multiply the point scale by the height factor R ÷ (R + h), where R is about 6,371,000 m and h the height of the site. The product is the combined scale factor. Grid = ground × factor, so ground = grid ÷ factor. On a small site one factor for the whole plot is enough.

Example. Point scale 0.9997, site at 640 m: height factor 0.99990, combined 0.99960.
Grid length from coordinates, m250.0 m
Ground length at a factor of 0.9996, m250.1 m
Common mistake

Multiplying by the factor

The factor is close to 1, so a wrong direction still looks plausible. Multiplying makes the tape length shorter than the grid, which is the wrong way round wherever the factor is below 1, and the fence ends short at the far pin.

Example. Ask: is the ground longer or shorter here? Then divide or multiply.

Ground length on another site

Different numbers from your task.

Not to scale
The problem
  • Grid length 250.0 m; combined scale factor 0.9996.
Step 1 of 1

Ground length

Length the tape reads, m?

250.0 m ÷ 0.9996 = 250.1 m.

In short. Ground = grid ÷ (point scale × height factor).

Check yourself

Question 1 of 2

The combined factor is 0.9995. A grid length of 400 m is on the ground about:

  • Right: 400 ÷ 0.9995.

  • That multiplies by the factor.

  • The factor matters at this length: 20 cm.

Question 2 of 2

Which two parts make the combined scale factor?

  • Right.

  • The tape is checked separately.

  • Area plays no part.

Read the source

Free official texts. The lecture cites clause numbers and puts the rules in its own words.