Cheat sheet
Land parcels: boundary, area, overlap, split and register
Every rule of the course on one page: how each figure is built, the mistake people usually make, and where it comes up at work. Print it or keep it open while you work.
- Rule
- The corners make the area. Fix a coordinate from the field book, never the area to fit the record.
- How it is built
- Computed area of P-12 = Computed area of P-12
- Usual mistake
- That is the area with the mistyped corner. Correct C3 to the field book and save first.
- At work
- Before a parcel record leaves the office, the surveyor compares the computed area with the legal one.
- Rule
- Coordinates give grid; the tape gives ground. Ground = grid ÷ combined factor.
- How it is built
- Street side on the ground = Grid length ÷ Combined factor
- Usual mistake
- You multiplied by the factor. Grid = ground × factor, so ground = grid ÷ factor: the tape reads longer.
- At work
- Every setting-out sheet says whether its lengths are grid or ground; the factor is printed on it.
- Rule
- One boundary, one set of points. A shared corner has one coordinate, held by both parcels.
- How it is built
- Overlap = ½ × Side C2 to C3 × Offset of N4
- Usual mistake
- That is side length × offset, a rectangle. The overlap is a triangle: take half.
- At work
- Overlaps and gaps are checked against the neighbours' records before a boundary is registered.
- Rule
- Compute the cut, then mark it. The new corners exist as coordinates before any peg goes in.
- How it is built
- Depth of lot 1 = N of the cut line − N of C1
- Usual mistake
- That is 6,000 ÷ 180, a rectangle. The sides lean outward, so the true depth is a little less.
- At work
- A subdivision is computed from the parent's coordinates and checked before the new corners are pegged.
- Rule
- A right needs a party and a parcel. The drawing shows where; the register says who.
- How it is built
- Easement = 4 m × Mean of street side and back edge
- Usual mistake
- That is 4 × 180, a rectangle. Side C2 to C3 leans east, so the strip is a little longer at its back edge.
- At work
- The register entry is made after the split: owner, rights and restrictions, each tied to the new parcel.