What a duplicate is
A duplicate is one piece of work paid for twice: the same work, in the same place, measured once but entered in two positions. An automatic check finds pairs by similar text and similar numbers, so it flags a duplicate and a look-alike in exactly the same way. A look-alike is two positions that read alike but cover different work: the same wall build-up on two storeys, or the same plaster on the inside and the outside face. Deleting a look-alike removes real work from the price and the bid becomes cheaper than the job.