Seven fields
The UK National Annex to ISO 19650-2 builds a container name from fields joined by hyphens: project, originator, volume or system, level or location, type, role and number. Each project publishes its own code list in its information standard. On this project AHC-CHE-ZZ-01-DR-S-2101 reads: the project, the structural engineer, all zones, first floor, drawing, structural, number 2101.