All 4 tasks freeIntermediate1 h of studyUnited Kingdom
Document control in a CDE (UK)
Work as the main contractor's document controller on a new health centre: find steel cut from drawings not authorised for construction, publish and issue the construction revision, make sure every holder of the old revision gets the new one, and check a subcontractor's file names against the project standard.

Who this course is for


The project and people are invented for training. The rules and contract forms are real.
You will be able to
- Tell from the CDE state and suitability code whether a drawing may be built from
- Publish a construction revision, issue it by transmittal to every holder, and check file names against the standard
Skills checked
- Tell from the CDE state and suitability code whether a drawing may be built from
- Publish a construction revision through the Gate B approval and issue it by transmittal
- Find every holder of a superseded revision and issue the current one to each
- Check file names field by field against the project information standard
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4File names that break the standardFoundation≈15 minTheory · 6 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
Certificate
Awarded when all 4 tasks pass the numbers, trace and explain checks.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Documentsdrawings and model4 files
What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses

Your roleContractor's commercial manager (quantity surveyor)
Interim payment assessment (UK, NEC4 Option B)
Price an NEC4 Option B assessment on a health centre new build: the Y(UK)2 and Construction Act timetable, the Price for Work Done to Date with X16 retention, pay less notices and VAT.
Intermediate2 h of studyFigures checked 14EN
All 4 tasks freeCertificate of completion

Your roleContractor's BIM coordinator (information manager)
BIM coordination and clash detection (UK, ISO 19650)
Coordinate a health centre's design models the ISO 19650 way: choose what goes into the federated model, set clash runs from the BEP clash matrix, triage hard and clearance clashes and duplicates.
Intermediate2 h of studyFigures checked 12EN
All 4 tasks freeCertificate of completion

Your roleSustainability / cost consultant preparing an upfront carbon estimate
Upfront carbon A1-A5 (UK)
Estimate the upfront carbon A1-A5 of a new health centre's frame, slabs and walls, and use it to decide: which wall swap cuts carbon per m², which nearer supplier cuts transport most.
Intermediate2 h of studyFigures checked 18EN
All 5 tasks freeCertificate of completion


