Theory before task 4 · 8 min

Investigating a near miss with the workers

A near miss, its investigation and the toolbox talk

After this lecture you can

  1. Say why a near miss is investigated like an injury.
  2. Find the root cause in the system, not the person.
  3. Choose a corrective action by the hierarchy and reassess.
1 / 3

No harm, same failure

A near miss is an incident in which nobody was hurt this time. The control that failed is the same one that will fail next time. ISO 45001 10.2 asks for incidents to be reported, investigated, their causes found and the risk assessment reviewed, harm or no harm.

Example. A scaffold board slips and lands next to a labourer: the same investigation as if it had hit him.
2 / 3

Ask why, with the gang

Keep asking why until the answer is something the organisation can change: a missing plan, a missing gate, a rule nobody was told. The people who do the job know why it was done that way; ISO 45001 5.4 asks for their participation, and a toolbox talk is where it happens.

Example. Why was the rail out? To land props. Why there? No landing point was planned. That is the root cause.
Common mistake

Blaming the person

'Operative failed to follow the rule' closes the report and leaves the cause in place. The next gang meets the same edge with the same props and no landing point.

Example. Retraining one foreman fixes one foreman.

Reassessing after a near miss

Different numbers from your task.

Not to scale
The problem
  • Materials hoist loaded at an open gate: severity 4, likelihood 4.
  • Corrective action: interlocked hoist gates, likelihood 2.
Step 1 of 2

Before

Score before the action?

4 × 4 = 16.

Step 2 of 2

After

Residual score?

4 × 2 = 8.

In short. Record, investigate with the workers, fix the system, rescore.

Check yourself

Question 1 of 3

A near miss had no injury. Investigate?

  • Right. ISO 45001 10.2.

  • Something failed.

  • The duty is the contractor's own.

Question 2 of 3

Which root cause can the organisation fix?

  • Right.

  • That names a person, not a cause.

  • Luck is what turned an injury into a near miss.

Question 3 of 3

Severity 5, likelihood 4 before; an engineering control brings likelihood to 1. Residual score?

5 × 1 = 5.