All 5 tasks freeFoundation1.5 h of studyInternational
Site safety: risk, permits, incidents and LTIFR
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Who it's for Health and safety lead

You will be able to
Skills checked
- Score site hazards by severity times likelihood and decide which ones stop the work
- Choose controls by the hierarchy of controls and rescore the residual risk (ISO 45001 8.1.2)
- Decide which jobs need a permit to work and issue a hot-work permit
- Investigate a near miss to its root cause and brief the corrective action in a toolbox talk
- Count lost-time injuries and work out the LTIFR per million hours for the monthly report
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Lost time and the LTIFR for the client's reportIntermediate≈25 minTheory · 9 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks.

What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses
Your roleSite managerSite diary and daily reports as contract records
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Foundation1.5 h of studyFigures checked 12EN
All 5 tasks freeCertificate of completion
Your roleEstimatorTender estimate: from net rates to the tender sum
On a fictional six-storey mixed-use building.
Foundation1 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion
Your roleQuantity surveyor at the client's cost consultantQuantity takeoff from PDF, DWG and IFC
On an invented six-storey mixed-use building.
Foundation1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion