Tender estimate: from net rates to the tender sum
On a fictional six-storey mixed-use building.
Who it's for Estimator

You will be able to
Skills checked
- Enter subcontract quotes in a bill of quantities as net rates and check the section total
- Take compounded overheads, risk and profit out of an all-in rate
- Price fixed and time-related preliminaries from the Time for Completion
- Carry provisional sums as stated and keep them out of the competition on price
- Add overheads, risk and profit once, on the running total, to reach the tender sum
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
Videos on this method
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Estimatebill of quantities18 lines
What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses
Your roleQuantity surveyor at the client's cost consultantQuantity takeoff from PDF, DWG and IFC
On an invented six-storey mixed-use building.
Foundation1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion

Your roleContractor's quantity surveyor
Price, win and vary a FIDIC contract
Take one building from tender to its first variation under the FIDIC Red Book 2017: price the last blank lines, build the tender sum, level and award the drywall.
Foundation1.5 h of studyFigures checked 21EN
All 5 tasks freeCertificate of completion
Your roleMain contractor's estimatorUnit rate build-up: labour, materials, plant, variation
On a fictional six-storey mixed-use building under the FIDIC Red Book.
Foundation1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion