Course introduction · 3 min

Sand stockpile: survey, tonnes and the tickets

You are the site surveyor on a fictional development plot. A sand heap stands in the stockpile area, and the supplier's invoice is on the site manager's desk. In four tasks you measure the heap, weigh it with the lab's density, check the tickets and put the book and the invoice right.

Start task 1

Open, level ground on a development plot with a sand heap, a GNSS rover pole beside it, no buildings yet.Fictional project
Development plot with stockpile areaOpen ground with a sand stockpile area
Works
About 2.4 ha of open ground: a sand stockpile, plot boundaries to register, levels for the platform.
Supply
Fill sand by the tonne, on delivery tickets
Method
Two surfaces, loose bulk density, tickets against the survey
Work in the ERP
4 tasks, about 1 h 12 min

Who hands what to whom

Every arrow is a figure that reaches your desk or leaves it, and the task where that happens.

Comes to you

  • Sand supplierDelivers and invoices
    • TicketsTask 3
  • Site labBulk density tests
    • SamplesTask 2
YouSite surveyor

Goes from you

    • VolumeTask 1
    • DeductionTask 4
    Site managerPays the supplier

Your route through the job

One heap, from rover points to a corrected book. Every task is free.

  1. Measure

    Task 1 · 12 min

    One heap, one volume

    You produce
    Pile volume
    Document
    Stockpile survey
    In the ERP
    Volumes, Stockpiles
  2. Measure

    Task 2 · 20 min

    Density turns cubic metres into tonnes

    You produce
    Tonnes at measured density
    Document
    Stockpile survey
    In the ERP
    Stockpiles
  3. Reconcile

    Task 3 · 20 min

    Tickets against the heap

    You produce
    Genuine tickets
    Document
    Haul tickets
    In the ERP
    Haul tickets
  4. Reconcile

    Task 4 · 20 min

    Close the gap: adjust the book, charge the supplier

    You produce
    Adjustment and deduction
    Document
    Stock book and invoice
    In the ERP
    Stockpiles

How a heap becomes a number on the books

Each step below is one task, in the order the site needs it.

Volume
Task 1VolumePile minus base.
Tonnes
Task 2TonnesVolume × density.
Tickets
Task 3TicketsRemove the copy.
Book
Task 4BookAdjust, then charge.

Blue is what the task adds; grey is carried over from before.

In short. Measure the heap, believe the measurement, and charge only what you can show on a ticket.