OpenConstruction Academy
Sign in / Register
EN

All 4 tasks freeIntermediate1 h of studyInternational

Sand stockpile: survey, tonnes and the tickets

On a fictional development plot.

Who it's for Site surveyor (stockpile survey and material reconciliation)

Workspace: Sand stockpile: survey, tonnes and the tickets
Measure the sand stockpile

You will be able to

Skills checked

  • Build a stockpile surface from rover points and measure its volume against the base surveyed before tipping (ISO 19111)
  • Turn surveyed cubic metres into tonnes with a measured loose bulk density (ISO 20290-1)
  • Check supplier delivery tickets against the surveyed heap and reject a ticket entered twice
  • Confirm the stock adjustment the survey supports and price the deduction from the supplier's invoice

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: One heap, one volume
  1. 1
    One heap, one volumeFoundation≈12 minTheory · 6 min
  2. 2
    Density turns cubic metres into tonnesFoundation≈20 minTheory · 6 min
  3. 3
    Tickets against the heapFoundation≈20 minhaul_ticketsTheory · 6 min
  4. 4
    Close the gap: adjust the book, charge the supplierFoundation≈20 minTheory · 6 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

Certificate

Awarded when all 4 tasks pass the numbers, trace and explain checks.

Certificates

Sample: Certificate of completion
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties3 records

Start free course All courses

What next

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 4All 4 tasks free · 1 h of study

Start free course