The stack is a recipe, not a list of percentages
Below the bill sits the markup stack: rows added in order until the tender sum is reached. Each row has two properties: a percentage or a fixed amount, and a base, the figure that percentage is taken from. Two stacks with identical percentages give different totals if the bases differ. That is why the base is as important as the rate, and why an assistant that remembers 'overheads 7 %' can still get the tender wrong.