OpenConstruction Academy
Sign in / Register
EN

Task 1 free, then €79Intermediate3.5 h of studyNetherlands · Pre-tender

AI-priced estimates: check the rates before you bid

Five tasks on the tender estimate of a fictional distribution warehouse.

Fictional project · Ravensholt Distribution CentreTask 1 as it opens in the trainer: Provenance first: which of the assistant's rates has a source at all

One course task, step by step

Read a short lecture, then do the work in the real ERP. Every figure you enter is checked and explained.

  1. Learn the method

    A worked example: you predict the figure, then see how it is built

    A worked example: you predict the figure, then see how it is built

  2. Do the task in the ERP

    Task 1: Provenance first: which of the assistant's rates has a source at all

    Task 1: Provenance first: which of the assistant's rates has a source at all

  3. Every figure is checked

    The check: which figures match, and which mistake you made

    The check: which figures match, and which mistake you made

People in this case

  • YouEstimator
  • Kerrigan SteelSteel quotation
  • The clientLogistics operator

The project and people are invented for training. The rules and contract forms are real.

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: Provenance first: which of the assistant's rates has a source at all
  1. 1
    Provenance first: which of the assistant's rates has a source at allFree≈35 minTheory · 9 min
  2. 2
    Matching: a real rate for the wrong itemPaid≈40 minTheory · 10 min
  3. 3
    Build-ups: the assistant's own estimate, and what it quietly includesPaid≈40 minTheory · 10 min
  4. 4
    The markup stack: the right percentage on the wrong basePaid≈40 minTheory · 10 min
  5. 5
    The row that was never produced, and the sum you signPaid≈40 minTheory · 9 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

You will be able to

Skills checked

  • Audit the source an AI assistant cites for a rate, edition by edition
  • Reject a real rate matched to the wrong scope, basis or unit
  • Build a net rate up from resource rates, waste and labour hours
  • Set each markup row on the base and in the order the firm's rules require
  • Sign off a tender sum against a cost per square metre benchmark

Videos on this method

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

The certificate is included in the price.

Certificates

Sample: Professional certificate
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties3 records
  • Estimatebill of quantities16 lines
  • Documentsdrawings and model5 files

Prices

€79one paymentPrice when sales open

Task 1 is free. Pay only if you want to go on. Start task 1 free

  • All 5 tasks and the professional certificate
  • No subscription, nothing renews
  • No VAT added: the price is the total

Cheaper in the bundle Digital and AI courses: 7 courses for €369 instead of €533

Buy now · €79

Course not as described? We fix it or refund you.

Need a discount? Write to info@datadrivenconstruction.io

How pricing works

What next

Next in the learning pathAI bill checks: verify the findings, then fix the billIntermediate · 3 h of study

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 5Task 1 free, then €79 · 3.5 h of study

Start task 1 free