Why the low number has a hole in it
A sub that wants to be low reads the scope narrowly. The cheapest drywall bid often finishes everything to Level 4, the normal finish for flat paint, and leaves out the Level 5 skim coat the specification asks for where light rakes along a corridor wall. The price is lower because the scope is smaller.