What a machine ranking compares
An ERP that ranks bids on their totals compares whatever each sub chose to price. If one bid includes a line another trade carries, it looks dearer than it is; if one leaves a line out, it looks cheaper. The ranking is a starting point. The leveled sheet, with every bid on one scope, is what you award from.