All 4 tasks freeIntermediate1 h of studyUnited States · Lump-sum public works bid (California public school)

Bid leveling: drywall subcontractor bids (US)

Bid a California public school as the general contractor's estimator: record a phoned sub bid as quoted, plug a scope gap, award the leveled low against the machine's rank, carry it into the base bid and work out which subcontractors the bid form must name.

Workspace: Bid leveling: drywall subcontractor bids (US)
The 1:05 phone bid: record it as quoted

Who this course is for

General contractor's estimator — The project and people are invented for training. The rules and contract forms are real.
Your role in the caseGeneral contractor's estimator

The project and people are invented for training. The rules and contract forms are real.

You will be able to

Skills checked

  • Record a phoned subcontractor bid exactly as quoted, blanks left blank
  • Level bids to one scope and plug a missing line by a stated rule
  • Award the leveled low bid rather than the lowest total as bid
  • Carry an award into the base bid and list subcontractors under California PCC 4104

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: The 1:05 phone bid: record it as quoted
  1. 1
    The 1:05 phone bid: record it as quotedFoundation≈10 minTheory · 8 min
  2. 2
    Open the bids and plug the gapFoundation≈15 minTheory · 9 min
  3. 3
    The leveled low, not the machine's rankFoundation≈20 minTheory · 9 min
  4. 4
    Carry the number and list your subs≈20 minEstimateTheory · 9 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

Videos on this method

Certificate

Awarded when all 4 tasks pass the numbers, trace and explain checks.

Certificates

Sample: Certificate of completion
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties5 records
  • Estimatebill of quantities21 lines
  • Tenderbid package5 lines

Start free course All courses

What next

Next in the learning pathComplete a GAEB X83 bill of quantities (Germany)Intermediate · 2 h of study

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 4All 4 tasks free · 1 h of study

Start free course