OpenConstruction Academy
Sign in / Register
EN

Tasks 1–2 free, then €79Intermediate3.5 h of studyUnited States · Lump-sum MEP subcontract to the general contractor

MEP estimating: electrical and HVAC takeoff and bid (US)

A paid course of six tasks, on an invented US job: a two-storey outpatient building in Texas.

Fictional project · Harwick Medical Office

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: Electrical takeoff: count the devices
  1. 1
    Electrical takeoff: count the devicesFreeFoundation≈12 minTheory · 9 min
  2. 2
    Electrical takeoff: conduit and wire for circuit A-7FreeFoundation≈25 min
  3. 3
    Price the electrical with labor unitsPaidFoundation≈45 minTheory · 9 min
  4. 4
    Ductwork: weight by gaugePaid≈45 minTheory · 9 min
  5. 5
    Build the MEP bid: burden, tax, markups, bondPaid≈50 minTheory · 10 min
  6. 6
    Price the change order from RFI 14PaidFoundation≈40 minChangeTheory · 8 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

You will be able to

Skills checked

  • Count devices from a plan legend and measure a branch circuit with rise, drops, make-up and waste
  • Price electrical work with labor units per unit or per 100 ft, a crew rate and material, and roll up the labor hours
  • Weigh rectangular duct by gauge and size from sheet weights and add a fittings allowance
  • Build an MEP bid: labor burden, small tools, sales tax on materials only, overhead, profit and bond
  • Price a change order from an addendum with adds and a credit under its own overhead and profit terms

Videos on this method

Certificate

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

The certificate is included in the price.

Certificates

Sample: Professional certificate
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties3 records
  • Estimatebill of quantities18 lines
  • Billingcontract

Prices

€79one paymentPrice when sales open

Tasks 1–2 are free. Pay only if you want to go on. Start the free tasks

  • All 6 tasks and the professional certificate
  • No subscription, nothing renews
  • No VAT added: the price is the total

Cheaper in the bundle United States: 6 courses for €229 instead of €334

Buy now · €79

Course not as described? We fix it or refund you.

Need a discount? Write to info@datadrivenconstruction.io

How pricing works

What next

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 6Tasks 1–2 free, then €79 · 3.5 h of study

Start the free tasks