Two areas in every lease
Office space in Indian cities is leased on super built-up area: the tenant's own floor plus a share of lobbies, lift cores and services. The carpet area is the floor inside the tenancy, the part the fit-out contractor works in. The ratio between them is the loading, often 30 to 45 %.
- Carpet area INR14,300
- Share of common areas INR5,700