The footprint, not the road
Topsoil holds roots and organic matter; left under an embankment it rots and settles, and in a cut it ends up in the fill. So it comes off the whole footprint of the earthworks: from the toe of each embankment slope or the top of each cut slope, plus a working margin. The plan draws that line as the stripping limit.
- Road width SAR10
- Slopes SAR8
- Margin SAR2