OpenConstruction Academy

Free hands-on courses with a certificate anyone can verify

Price, tender, build and bill a project in a free ERP.

You do the estimator's or quantity surveyor's tasks in OpenConstructionERP, and every figure you enter is checked against a worked solution.

Each block is one course. Stack them into a career.
  1. Student or traineePDF takeoff · Estimate
  2. EstimatorTender · Procurement
  3. Quantity surveyorBilling · Change · Cost report
  4. Project or commercial managerEarned value · Risk

OpenConstruction Academy · video library

Find the minute that answers your question.

OpenConstruction Academy teaches estimating, tendering, site control and billing in the free, open-source OpenConstructionERP. Free lessons for estimators, site and project managers. Search what is said in every video and jump to that moment.

OpenConstructionERP auf Deutsch

Twelve films on one German housing project, from set-up to the cost base: quantities, the bill, GAEB, pricing, award, purchasing.

  1. Projekt und Verantwortung klären 7:17 · How do I set up a new project with two variants, a budget cap with a reserve, and clear decision owners?
  2. Dokumente und Entscheidungen sichern 5:59 · How do I resolve a clash between two drawings with an RFI and make sure the team uses the approved revision?
  3. Mengen aus PDF und DWG ermitteln 5:55 · How do I measure areas and lengths on a PDF plan and count items in a DWG so every quantity can be traced to its source?
  4. BIM-Modelle verstehen und nutzen 5:40 · How do I filter an IFC or RVT model by storey and element type and export the selection to CSV?
  5. Ein Leistungsverzeichnis aufbauen 5:02 · How do I structure a Leistungsverzeichnis with sections, item numbers, descriptions, units and checked quantities?
  6. Einheitspreise und Kosten nachvollziehen 6:36 · How is a unit rate built from labour, material and equipment, and how does a change in labour time change the price?
  7. GAEB-Dateien kontrolliert austauschen 5:34 · How do I export a bill as GAEB X83, get priced X84 back and check that no item or price was lost?
  8. Angebote prüfen und Vergabe vorbereiten 3:04 · How do I compare bids on the same scope when the lowest one is missing an item, and record the award rationale?
  9. Abhängigkeiten und Ressourceneinsatz planen 4:31 · How do I link activities, trace a late delivery through the schedule and assign a crew to the new dates?
  10. Material und Teillieferung verfolgen 7:01 · How do I track an order, a partial delivery and the remaining quantity, and book what actually arrived into site stock?
  11. Kostenquellen und Ressourcen anpassen 7:35 · How do I take a rate from a regional cost database, check its origin and scope, and reprice it with my own labour and plant rates?
  12. Vom vollständigen LV zur Kostenbasis 10:14 · How do I turn a fully priced bill into a checked, locked cost base and budget before tender award?

Getting Started

Install OpenConstructionERP, then learn the cost database, build an estimate and turn cost into a price.

  1. How to Install OpenConstructionERP 4:42 · How do I install OpenConstructionERP, add my team and create my first project?
  2. Construction Cost Database: Check a Unit Rate 4:02 · Where does a unit rate come from, and how do I adjust it to my own crews and market?
  3. Build a Construction Estimate Step by Step 4:47 · How do I build a priced estimate from an empty page, with every rate traced to its source?
  4. Construction Pricing: Overhead, Profit & Contingency 3:54 · How do I turn a direct cost into a bid price with overhead, profit and contingency and send it safely?
  5. Bid Leveling: Three Quotes, One Job 3:10 · How do I compare three subcontractor quotes for the same job and pick the real low bid?
  6. Budget vs Actual: Track Every Dollar 3:22 · How do I track the real cost of a job against the budget and forecast where it will finish?
  7. Build the Schedule: What Cannot Slip 3:03 · How do I build a schedule from my estimate and find which tasks cannot slip?
  8. Manage Your Subs: Pay, Hold Back 3:13 · How do I run a subcontractor from signed order to final payment, with changes approved and retainage held?
  9. On Site: Log, Inspect, Fix 2:58 · How do I take a site problem from the daily log through inspection, non-conformance and punch item to a verified fix?
  10. The Big Picture: KPIs to Portfolio 2:35 · How do I see at a glance which of my jobs needs attention today?

Canada: Ontario Construction

Price, tender, bill and close out an Ontario job: HST, CCDC 2 draws, the 28-day payment clock, holdback, change orders and substantial performance.

  1. Price a Construction Job 4:49 · How do I price a Toronto job with Canadian markups and bond, and why does HST stay off the bid?
  2. Tender Work to Subcontractors 4:23 · How do I check a suspiciously low sub bid before I carry it, and award the subcontract?
  3. CCDC 2 Monthly Progress Draw 4:57 · How do I bill a monthly progress draw on a CCDC 2 job with Ontario's 10% holdback?
  4. The Construction Payment Clock 4:35 · When does the owner have to pay my invoice in Ontario, and what happens if no notice of non-payment comes?
  5. Manage Construction Change Orders 4:45 · How do I give notice, price and get approval for a change under CCDC 2 when we hit unforeseen rock?
  6. Schedule to Substantial Performance 4:48 · What is substantial performance in Ontario, and how do I get my job there and start the holdback clock?

Québec : la construction en français

Five lessons in French for Québec: start in French, estimate with GST/QST, BSDQ sub bids, billing with holdback and legal hypothec, acceptance of work.

  1. Démarrer avec OpenConstructionERP en français 3:46 · How do I use the software in French and map its France-French terms to Québec site vocabulary?
  2. Estimer un projet de construction 4:17 · How do I price a Montréal job with markups, and where do GST, QST and my RBQ licence number go?
  3. Soumissions et BSDQ 4:30 · Can I accept the lowest BSDQ bid if it arrived without the required bid bond?
  4. Facturation, retenue et hypothèque légale 4:37 · How do I prepare a payment application with contract retention in Québec and keep my legal hypothec?
  5. Réception des travaux et déficiences 3:44 · What does réception des travaux trigger in Québec, and how do I track deficiencies to verification?

Gestion de chantier

Four French lessons on running a job: justify the budget, buy and track stock, log site hours and equipment, invoice and read the balance.

  1. Budget de chantier : justifier chaque coût 5:06 · How can I explain every line of my project budget before we commit to the site?
  2. Achats et stock : suivre les quantités 4:36 · Why do 1,000 ordered bags leave only 600 in stock, and how do I trace every difference?
  3. Chantier : suivre les heures et le matériel 5:22 · What do 64 crew hours tell me, and how do I link them to measured work and equipment waiting time?
  4. Facture et paiement : comprendre le solde 5:39 · Why is 12,000 still outstanding when 30,000 of work has been invoiced?

Dal computo metrico allo svincolo della ritenuta

Eight lessons follow one building project and one thread of money, from reading the bill of quantities to releasing the retention, as the contractor's site office.

  1. Come leggere il computo metrico prima di fare l'offerta 4:25 · How do I check a computo metrico estimativo line by line before I bid, and which part of the total can be discounted?
  2. Ribasso d'offerta: analisi prezzi e margine 4:39 · How far can I lower my bid before the job loses money, once site overheads are counted?
  3. Subappalto: confrontare le offerte e scegliere l'impresa 4:59 · How do I compare three subcontractor bids fairly when the lowest one leaves out a line?
  4. Giornale di cantiere: documentare imprevisti ed extra 4:32 · How do I record unexpected ground conditions on the day so the extra foundations get paid?
  5. Varianti in cantiere: nuovi prezzi e ordini di modifica 5:13 · How do I turn a variant request into an order linked to the contract, build a new price for an item missing from the price list, and check the legal limits?
  6. Stato di avanzamento lavori: dal certificato alla fattura 4:57 · How do I get from site measurements to a progress certificate and an invoice with the right retention?
  7. Consuntivo di cantiere: dove è finito il margine 4:45 · How do I find out which chapters lost margin, and what the client owes me for a late payment?
  8. Fine lavori: collaudo e svincolo della ritenuta 5:09 · What do I need to get the held-back retention released and invoiced at the end of the job?

从投标到结算:每一分钱都对得上

Eight lessons follow one Chinese office-building contract from bid price to final account audit, covering the GB/T 50500-2024 bill of quantities, payments, changes, claims and cost control.

  1. 工程量清单投标价怎么算:四大块与增值税陷阱 5:03 · How do I build a bid price in four blocks under the new Chinese standard without charging VAT twice on a provisional sum?
  2. 预付款基数怎么核对:签约一周的三笔钱与三张保函 5:25 · How do I calculate the advance payment, the safety fee and the retention correctly in the week the contract is signed?
  3. 暂估价招标:比价、清标、定标,最低价未必最省 5:20 · How do I compare three bids for a provisional-sum package when the lowest one leaves out a room?
  4. 进度款怎么算:干了361万,为什么只到账252.7万 5:15 · How do I calculate the monthly progress payment on a cumulative basis with an 80% payment ratio?
  5. 变更与签证:口头指示变书面,按合同期限报价 5:05 · How do I turn a verbal instruction from the client's representative into a priced change within the contract deadlines?
  6. 材料调差与费用索赔:钢筋涨价和停工7天怎么算 5:17 · How much of a rebar price rise and a 7-day stoppage can I really claim from the employer?
  7. 成本核对:产值、目标成本与实际成本,把超支拆到原因 5:17 · How do I split a project cost overrun into causes I can claim from the employer and causes I must absorb?
  8. 竣工结算审核:送审3,701.18万,审定3,664.7万 5:25 · Why does the employer's audit cut a final account, and how do I get the last payment and retention?

Жилищна сграда: от КСС до гаранциите

Nine lessons follow one Bulgarian residential building from the bill of quantities and bid to Act 19 payments, changes, final act, warranties, cash flow and the site diary.

  1. Акт 19: от изпълнените СМР до сумата за плащане 2:21 · How do I turn the work done this month into an Act 19 and the amount I can invoice?
  2. КСС и оферта: импорт от Excel, проверка на цените и ДДС 1:57 · How do I import a bill of quantities from Excel, check the prices and add VAT to get a bid total?
  3. Анализ на единична цена: материали, труд, механизация и печалба 2:14 · How do I explain a unit price, such as EUR 146 per m3 of concrete, as materials, labour and plant plus overheads and profit?
  4. Договор и линеен график: срок, аванс и етапи на строителството 2:18 · How do I put the contract term and advance into the platform and show on a linear schedule when each act and payment falls due?
  5. Избор на подизпълнител: сравнение на оферти по цена и срок 1:58 · How do I choose between three subcontractor bids when the cheapest one does not fit the schedule?
  6. Заменителна таблица и анекс: как се отчитат промените в СМР 2:03 · What is the difference between a substitution table and an annex, and how do I record each one?
  7. Окончателен акт: остатък от аванса, приемане и гаранции 2:17 · How do I issue the final act so the advance is recovered exactly, and set up the warranty periods?
  8. Бюджет и паричен поток: кога строителният проект остава без пари 2:08 · How do I check whether the developer's money lasts from Act 14 to Act 16, given the buyers' payment schedule?
  9. Строителен дневник и проверки: забележки, срокове и проследяване 2:03 · How do I keep the weekly site diary, record a supervision inspection and track every defect to its deadline?

Obra pública y privada en España: de la oferta BC3 a la liquidación

Eight lessons following one public works contract in Spain: BC3 import and bid with baja, subcontractor comparison, precio contradictorio, monthly certification, cost-value control, handover and settlement, then private works with retention and the site diary.

  1. Certificación de obra: del avance mensual al cobro 3:21 · How do I turn this month's measured progress into a certificación de obra and know how much I will be paid?
  2. Importar BC3 y preparar una oferta de obra: PEM, gastos y baja 2:40 · How do I import the BC3 from a tender, add overheads and profit, and prepare a bid with a baja without losing the original budget?
  3. Comparativo de ofertas de obra: precio, alcance y adjudicación 2:10 · Is the cheapest of three subcontractor bids really the cheapest once the scope is the same, and how do I award it with its purchase order?
  4. Precio contradictorio: valorar y aprobar un cambio de obra 2:09 · A client asks for a unit of work that is not in the project: how do I build its precio contradictorio and get it approved?
  5. Control de costes de obra: cierre de mes y margen real 2:09 · Certifying is not earning: how much money has the job really made this month, and what margin do I forecast at the end?
  6. Recepción y liquidación de obra: repasos, certificación y garantía 2:00 · When is a public works contract really closed: what happens at the recepción, the snag list, the final certification and the guarantee until the liquidación?
  7. Obra privada: certificación, retención del 5 % y factura 2:43 · On a private job, does the invoice carry VAT, and what happens to the 5% the client withholds from each certification?
  8. Diario de obra e inspecciones: órdenes y no conformidades 1:53 · When someone asks who said what on site, where is the proof: how do I link the diary, the orders book, the inspection and the non-conformity?

Kinderhaus-Kostenkette nach DIN 276: vom Kostenrahmen zur Kostenfeststellung

One municipal building project in eight lessons: the six DIN 276 cost stages from Kostenrahmen to Kostenfeststellung, GAEB tendering, bid comparison under VOB/A, site diary, variations and interim invoices under VOB/B, and acceptance.

  1. Kostenrahmen nach DIN 276 erstellen 3:45 · How do I set up a project in Germany and give the client a first cost figure, the Kostenrahmen to DIN 276, before there is a plan?
  2. Kostenschätzung nach DIN 276 erstellen 3:28 · How do I turn the first design into a Kostenschätzung and show the council exactly what changed against the Kostenrahmen?
  3. Kostenberechnung nach DIN 276 3:36 · How do I build the Kostenberechnung at second level of DIN 276 and justify its difference to the Kostenschätzung before the council decides to build?
  4. Kostenvoranschlag und GAEB 3:40 · How do I price the Rohbau bill of quantities myself, report the Kostenvoranschlag to the client, and send the bill to bidders as GAEB without my prices?
  5. Vergabe im Bauwesen 3:43 · How do I compare three bids for the Rohbau, clarify a suspiciously low price under VOB/A and prepare the award?
  6. Baubeginn organisieren 3:27 · How do I set up the construction schedule and keep a site diary that still protects me when a claim comes later?
  7. Nachträge und Abschlagsrechnungen prüfen 4:02 · How do I check two Nachträge and two Abschlagsrechnungen before the client pays, with the 5% Sicherheitseinbehalt calculated by the platform?
  8. Bauabnahme und Schlussrechnung 3:45 · How do I run the formal Abnahme, record the defects, check the Schlussrechnung and close the cost chain with the Kostenfeststellung?

Hrvatska: od ugovorenog troškovnika do financijskog stanja projekta

Five lessons on one Croatian building contract: Excel bill import, supplier invoices with VAT reverse charge, a subcontractor with retention, the first interim statement with a Gantt chart, and the project financial position with extra quantities.

  1. Ugovoreni troškovnik: uvoz iz Excela 4:10 · How do I bring the signed Excel troškovnik into the app so that the total matches the contract, and save it as the contracted version?
  2. Ulazni računi povezani s troškovnikom 4:28 · How do I enter supplier invoices, link them to the contract bill and see what has been spent, with and without VAT?
  3. Podizvođači: ugovor, situacija i plaćanje 4:50 · How do I contract earthworks to a subcontractor, check its first situacija against the site and pay it with a 5% retention?
  4. Privremena situacija iz izvedenih radova 4:45 · How do I build a Gantt chart from the bill, record progress with evidence and issue the first privremena situacija to the client?
  5. Financijsko stanje projekta i višak radova 5:13 · Are we making money on this project, and how do I record extra quantities and prepare the final statement?

UK: Tender to Variation on a JCT Building Job

Six lessons follow one UK job in OpenConstructionERP: pricing an NRM 2 tender, comparing subcontract bids, a JCT interim payment with retention, Construction Act payment notices, CIS and the VAT reverse charge, and valuing a Variation.

  1. How to Price a Construction Tender (NRM 2) 5:53 · How do I price a tender on an NRM 2 bill so that every cost is counted only once?
  2. How to Compare Subcontractor Bids 6:01 · How do I compare three subcontractor bids like for like, when the cheapest one has left out a line?
  3. JCT Interim Payments and Retention 6:25 · How do I raise a monthly interim application on a JCT contract and work out the retention the client keeps?
  4. Payment Notice vs Pay Less Notice 6:27 · Which four dates decide what a subcontractor is paid under the Construction Act, and how do I track them and rescue a missed payment notice?
  5. CIS Deductions and VAT Reverse Charge 6:34 · What do I actually pay a subcontractor after the CIS deduction, and how does the VAT reverse charge fit in?
  6. How to Value a JCT Variation 5:54 · How do I value a JCT Variation from the bill and record it until the contract sum moves?

Estimating Basics

Five standalone lessons on the basics of estimating: reading an estimate, markup and margin, takeoff from PDF drawings, quantities from a Revit or IFC model, and a spreadsheet next to estimating software.

  1. How to Read a Construction Estimate Line by Line 8:30 · How do I read a construction estimate line by line and tell whether its total is complete?
  2. Markup vs Margin in Construction 7:36 · What is the difference between markup and margin, and how do I set a price that keeps the profit I planned?
  3. Quantity Takeoff from PDF Drawings 7:14 · How do I measure quantities from a PDF floor plan accurately and avoid scale mistakes?
  4. From a Revit or IFC Model to a Cost Estimate 8:08 · How do I turn the quantities in a Revit or IFC model into a priced cost estimate?
  5. Excel vs Estimating Software 8:08 · Which estimating mistakes does a spreadsheet hide, and which ones does estimating software catch?

Obra pública no Brasil: do orçamento SINAPI à nota fiscal

Five lessons follow one Brazilian public works job: the SINAPI reference budget and BDI, a bid under Lei 14.133 with the 75% rule, the physical-financial schedule with Gantt, critical path and S-curve, measurement with a 25% addendum and INCC adjustment, and the NFS-e with ISS and INSS withholdings.

  1. Orçamento de obra pública: SINAPI, composição e BDI 9:35 · How do I build a public-works reference budget from SINAPI compositions and check the BDI against the TCU ranges?
  2. Licitação de obras públicas: proposta e regra dos 75% 7:26 · How does a small contractor turn the reference budget into a bid under Lei 14.133 without falling under the 75% floor?
  3. Cronograma físico-financeiro de obra: Gantt, caminho crítico e curva S 7:07 · How much money does the job need each month, and how do I show it in a physical-financial schedule with a Gantt chart and S-curve?
  4. Medição de obra pública: boletim, aditivo de 25% e reajuste INCC 7:29 · How do I measure executed work, formalise an addendum within the 25% limit and apply the INCC adjustment on a public works contract?
  5. Nota fiscal de obra (NFS-e): retenções de ISS e INSS 7:32 · Why is the net amount received smaller than the invoice total, and how do ISS, INSS and guarantees change the contractor's cash?

Budowa domu w Polsce: od kosztorysu do aneksu

Five lessons follow one Polish house build: the estimate with bill of quantities, unit prices, overheads and VAT, the contractor's offer and the 30% threshold, the contract with schedule and payment plan, stage acceptance and invoice, and extra works with an annex and indexation.

  1. Jak zrobić kosztorys budowy domu? Przedmiar, ceny i narzuty 6:53 · How do I build a house estimate from a bill of quantities, unit prices, overheads and the right VAT rate?
  2. Kosztorys ofertowy: wycena robót i porównanie kosztów 6:50 · How do I turn the investor's estimate into a winning offer estimate and check that it will not be rejected as abnormally low?
  3. Umowa o roboty budowlane: harmonogram i plan płatności 7:12 · What should I check before signing a construction works contract, and how do I set up the schedule and the instalment plan?
  4. Odbiór robót i faktura: rozliczenie etapu budowy 6:59 · How do I accept a stage of works, calculate the amount due after retention, and issue the invoice with the right VAT?
  5. Roboty dodatkowe: wycena zmiany, aneks i waloryzacja 7:10 · How do I price extra works, record them as an annex to the contract, and protect myself against rising prices?

Kamu yapım işi: yaklaşık maliyetten kesin hesaba

Five lessons follow one Turkish public works job: the approximate cost from quantities, a bid and the limit value for abnormally low bids, contract signing with performance bond and work schedule, an interim payment with its deductions, and price adjustment, extra work and final account.

  1. Yaklaşık Maliyet Nasıl Hesaplanır? Metrajdan Keşif Özetine Adım Adım (2026) 7:22 · How do I calculate the approximate cost of a public building job item by item, from quantities and unit price analysis to the bill of quantities summary and VAT?
  2. İhale Teklifi Nasıl Hazırlanır? Teklif Hesabı, Sınır Değer ve Aşırı Düşük Teklif (2026) 7:28 · How do I price a lump-sum public tender bid, and how is the limit value for abnormally low bids calculated from the opened tenders?
  3. Yapım Sözleşmesi Nasıl İmzalanır? Kesin Teminat, Götürü Bedel ve İş Programı (2026) 7:28 · What must I do between winning a public tender and starting work: performance bond, stamp tax, contract, site handover, work schedule and payment plan?
  4. Hakediş Nasıl Hazırlanır? Metrajdan Ödemeye Örnek Hakediş (2026) 7:33 · How do I prepare a monthly interim payment (hakediş) on a lump-sum public contract and work out what actually reaches my account after VAT and deductions?
  5. Fiyat Farkı, İlave İş ve Kesin Hesap: Bir Yapım İşini Örnekle Kapatmak (2026) 7:50 · How do I handle an extra work item with a new unit price, calculate the price adjustment, and close the job with the final account and the release of locked money?

Дом из газобетона в Подмосковье: от сметы до окончательного расчёта

Five lessons follow one private house shell in Russia: the estimate on GESN norms, comparing three contractor bids, the building contract with staged payment or escrow, the KS-2 and KS-3 acts with 5% retention, and extra works with the final account and warranty.

  1. Сколько стоит построить дом из газобетона в 2026: смета на коробку по позициям 7:44 · How do I estimate the shell of a gas-concrete house line by line, and what does a price per square metre hide?
  2. Три сметы на один дом: как сравнить подрядчиков и что в них спрятано 9:12 · How do I compare three contractor estimates for the same house, and where is a low price hiding missing work?
  3. Договор подряда на строительство дома в 2026: эскроу, этапы оплаты, что проверить 8:57 · What must a house-building contract contain, and should I pay by stages or through an escrow account?
  4. КС-2 и КС-3: что это и нужны ли при строительстве частного дома 6:54 · What are the KS-2 and KS-3 forms, are they required on a private house, and what do I check before signing?
  5. Допработы по договору подряда: допсоглашение, окончательный расчёт, гарантия 7:13 · Which extra works must I pay for under a fixed-price contract, and how do I close the contract and keep the warranty?

عظم فيلا في شمال الرياض: من الكميات إلى الفاتورة الضريبية

Five lessons follow one villa shell in Riyadh: pricing the materials from the drawings, levelling three subcontractor bids and adding overhead and profit, writing the contract with advance, retention and a capped delay penalty, the first monthly claim with VAT, and a change order with the e-invoice.

  1. كم تكلّف مواد عظم فيلا في الرياض؟ جدول كميات خطوة بخطوة 10:00 · How do I price the materials of a villa shell item by item, and which material moves the total most?
  2. مصنعية العظم: ثلاثة عروض لعظم واحد، أيها الأرخص فعلاً؟ 8:01 · How do I compare three subcontractor offers for the same villa shell, and what do I add on top to get my price?
  3. عقد العظم: من 240 ألفاً، كم تقبض فعلاً؟ 7:40 · How do I write a villa shell contract, and how do the advance, retention and delay penalty change what I receive?
  4. أول مستخلص: 42 ألفاً من العمل… كم يصل حسابك؟ 7:02 · How do I write the first monthly interim claim on a re-measurement contract, and why is the cash received lower than the value of the work?
  5. «أريد بلكونة»: أمر تغيير وفاتورة ضريبية إلكترونية 7:09 · How do I handle an owner's request for a balcony on site, and what must the tax invoice for the first claim contain?

भारत में अपना घर बनवाना: ड्रॉइंग से BOQ और फ़ाइनल बिल तक

Five lessons follow one family house in India: why a per-sq-ft rate is not a budget, how to level three quotations and choose between labour-only and material contracts, the agreement with stage payments, the RA bill check with retention and GST, and extras and the final bill.

  1. घर बनाने का खर्चा 2026: रेट per sq ft बनाम असली BOQ (30×40 प्लॉट, G+2 घर) 8:21 · How much does a G+2 house on a 30x40 ft plot really cost, and how do I build my own BOQ instead of relying on a per-sq-ft rate?
  2. ठेकेदार कैसे चुनें? 3 कोटेशन की सही तुलना, लेबर ठेका या मटीरियल के साथ 8:35 · How do I compare three contractor quotations fairly, and is a labour-only contract really cheaper than one with materials?
  3. घर बनाने का एग्रीमेंट और स्टेज पेमेंट: ठेकेदार को पैसे कब और कितने दें 8:21 · What should a house-building agreement say, and how do I tie payments to measured work instead of paying a fixed amount every month?
  4. RA बिल क्या होता है? मेज़रमेंट बुक, रिटेंशन, GST: घर के काम का बिल कैसे जाँचें 8:07 · How do I check a contractor's running account (RA) bill with the measurement book, retention, advance recovery and GST before paying it?
  5. एक्स्ट्रा काम और फ़ाइनल बिल: बजट से बाहर खर्चा कैसे रोकें 8:23 · How do I price and approve extra work, and close the contract with a final bill and retention release without surprises?

Xây nhà phố ở Việt Nam: từ dự toán đến quyết toán

Five lessons follow one Vietnamese townhouse: why a per-m2 quote cannot be compared and how to estimate item by item, three bids levelled on one quantity sheet, a contract with a payment schedule that stays behind the work, inspection before concealment and a payment claim, and variations to the final account.

  1. Xây nhà 3 tầng 1 tum hết bao nhiêu tiền? Tự lập dự toán nhà phố 5×20 (2026) 8:30 · How much does a 3-storey townhouse cost, and how do I check a per-m2 quote by estimating each item with official norms and local prices?
  2. Xây nhà trọn gói hay phần thô? So 3 báo giá, người rẻ nhất lại không rẻ (2026) 9:36 · How do I compare three contractor bids for a house, find the lines a bidder left blank, and decide between turnkey and shell-only?
  3. Hợp đồng xây nhà: lịch trả tiền thế nào để tiền không chạy trước việc (2026) 8:13 · How do I write a house-building contract and a payment schedule so that money does not run ahead of the completed work?
  4. Nghiệm thu xây nhà: kiểm tra cốt thép trước khi đổ bê tông, rồi mới trả tiền (2026) 7:28 · What must be inspected before concrete covers it, how do I record a failed check and a defect, and how is the second payment calculated?
  5. Xây nhà bị phát sinh: tính thế nào cho đúng? Quyết toán đến đồng cuối cùng (2026) 9:24 · How do I price, sign and reject variations on a house contract, and then settle the final account?

Membangun rumah di Indonesia: dari RAB sampai serah terima dan SLF

Five lessons follow one Indonesian family house: a RAB built from AHSP coefficients and official unit prices, the choice between full contract, labour-only and daily labour, the contract with DP, termin and S-curve, opname and payment with retention and VAT, and variations, handover and SLF.

  1. Biaya Bangun Rumah 2 Lantai 2026: Cara Hitung RAB Sendiri (Volume × Harga Satuan) 8:31 · How do I work out the cost of a 2-storey house myself with a RAB from volumes, AHSP coefficients and unit prices, instead of a price per square metre?
  2. Borongan Penuh, Borongan Tenaga, atau Harian? Hitung Mana yang Lebih Murah 8:42 · Is it cheaper to build a house with a full contract, a labour-only contract or daily labour, and who carries the risk in each?
  3. Kontrak Borongan Rumah: DP, Termin, dan Jadwal yang Aman untuk Pemilik 8:30 · How do I set up a fixed-price house contract with a safe DP, stage payments (termin), retention and schedule so money does not run ahead of the work?
  4. Opname Pekerjaan dan Bayar Termin: Cara Hitung Retensi dan PPN yang Benar 8:16 · How do I measure completed work (opname) with the contractor and calculate the correct termin transfer after the DP deduction, retention and VAT?
  5. Pekerjaan Tambah Kurang, Serah Terima, dan SLF Rumah Tinggal 8:06 · How do I price and document additions and omissions on a house contract, then run handover, retention release and the SLF?

Browse by task

Setup · Cost database · Estimating · Quantity takeoff · BIM models · BOQ & GAEB · Markups & tax · Tendering & award · Contracts · Progress billing · Payments · Retention / holdback · Change orders · Scheduling · Purchasing & stock · Site control · Budget control · Handover · Documents & RFIs · Project setup