Cheat sheet

AI bill checks: verify the findings, then fix the bill

Every rule of the course on one page: how each figure is built, the mistake people usually make, and where it comes up at work. Print it or keep it open while you work.

Task 1

Flagged duplicates: which of them is really one

Theory (9 min)
Rule
Same work, same unit, same area is priced twice. Zero the quantity and keep the rate; the sum drops and the rate stays on file.
How it is built
  • Real doubles = Pairs with the same work, unit and area
  • Value taken out = Line totals of the positions set to zero, added up
Usual mistake
Every flag was accepted. Some pairs only look alike: check unit and area.
At work
Estimators get AI findings lists more and more often; each finding is checked against the measurement before the bill changes.

Task 2

What the report cannot find: work with no position

Theory (10 min)
Rule
A findings list only covers what is in the bill. Check completeness the other way round: specification first, bill second.
How it is built
  • New position value = Measured quantity × Price-list rate
  • Value added = Titel 02 total now − Titel 02 total before
Usual mistake
That is the slab alone. The specification puts blinding under the foundations as well.
At work
Before a bill goes out, the estimator ticks every specification item off against a bill position.

Task 3

Quantities against the measurement rules

Theory (10 min)
Rule
Measure by the rules of the bill. An opening comes off only when it is larger than the preamble's threshold, and a lintel is paid by the metre.
How it is built
  • Wall area = Gross wall area − Openings above the threshold, number × area
  • Lintel length = Number of lintels × lintel length, each type
  • Change to Titel 04 = Titel 04 total now − Draft total
Usual mistake
Every opening was deducted. The preamble leaves the small ones in.
At work
German bills follow the preamble's measurement rules; the client's checker tests every deduction against them.

Task 4

Priced but not in the sum: Bedarf and Alternativ

Theory (9 min)
Rule
Priced is not counted. Quantity 0 keeps the rate on file and the position out of the sum; deleting it loses the price.
How it is built
  • Wrongly counted = Bedarfsposition total + Alternativposition total
  • Titel 05 with the alternative = Titel 05 as it goes out − 05.10 + 05.30 at the same area
Usual mistake
The alternative came out and the dewatering is still in the sum.
At work
German tenders often carry such positions; the firm keeps their rates and sets the quantity to zero.

Task 5

Sign off the bill and the report

Theory (9 min)
Rule
Judge the tool by two counts. The findings that held, and the errors in the bill that no line of the report names.
How it is built
  • Cost per m² = Direct cost ÷ Gross floor area
  • Findings that held = Report lines that survived the check
  • Errors the report missed = Positions you changed that no finding names
Usual mistake
Every finding was accepted. Some of them did not survive verification.
At work
The estimator signs off a bill with a short note saying what was checked and what the tool missed.