Cheat sheet
AI bill checks: verify the findings, then fix the bill
Every rule of the course on one page: how each figure is built, the mistake people usually make, and where it comes up at work. Print it or keep it open while you work.
- Rule
- Same work, same unit, same area is priced twice. Zero the quantity and keep the rate; the sum drops and the rate stays on file.
- How it is built
- Real doubles = Pairs with the same work, unit and area
- Value taken out = Line totals of the positions set to zero, added up
- Usual mistake
- Every flag was accepted. Some pairs only look alike: check unit and area.
- At work
- Estimators get AI findings lists more and more often; each finding is checked against the measurement before the bill changes.
- Rule
- A findings list only covers what is in the bill. Check completeness the other way round: specification first, bill second.
- How it is built
- New position value = Measured quantity × Price-list rate
- Value added = Titel 02 total now − Titel 02 total before
- Usual mistake
- That is the slab alone. The specification puts blinding under the foundations as well.
- At work
- Before a bill goes out, the estimator ticks every specification item off against a bill position.
- Rule
- Measure by the rules of the bill. An opening comes off only when it is larger than the preamble's threshold, and a lintel is paid by the metre.
- How it is built
- Wall area = Gross wall area − Openings above the threshold, number × area
- Lintel length = Number of lintels × lintel length, each type
- Change to Titel 04 = Titel 04 total now − Draft total
- Usual mistake
- Every opening was deducted. The preamble leaves the small ones in.
- At work
- German bills follow the preamble's measurement rules; the client's checker tests every deduction against them.
- Rule
- Priced is not counted. Quantity 0 keeps the rate on file and the position out of the sum; deleting it loses the price.
- How it is built
- Wrongly counted = Bedarfsposition total + Alternativposition total
- Titel 05 with the alternative = Titel 05 as it goes out − 05.10 + 05.30 at the same area
- Usual mistake
- The alternative came out and the dewatering is still in the sum.
- At work
- German tenders often carry such positions; the firm keeps their rates and sets the quantity to zero.
- Rule
- Judge the tool by two counts. The findings that held, and the errors in the bill that no line of the report names.
- How it is built
- Cost per m² = Direct cost ÷ Gross floor area
- Findings that held = Report lines that survived the check
- Errors the report missed = Positions you changed that no finding names
- Usual mistake
- Every finding was accepted. Some of them did not survive verification.
- At work
- The estimator signs off a bill with a short note saying what was checked and what the tool missed.