OpenConstruction Academy
Sign in / Register
EN

Task 1 free, then €79Intermediate3.5 h of studyUnited Arab Emirates · FIDIC Red Book 2017 based contract with a bill of quantities

Rebar takeoff and bar bending schedule (UAE, BS 8666)

Intermediate course, five tasks, on an invented residential block in the UAE.

Fictional project · Khor Sama ResidenceTask 1 as it opens in the trainer: Beam B7: bars by shape code

People in this case

  • YouThe contractor's quantity surveyor
  • EngineerIssues drawings and instructions
  • Steel supplierQuotes and delivers the steel

The project and people are invented for training. The rules and contract forms are real.

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: Beam B7: bars by shape code
  1. 1
    Beam B7: bars by shape codeFree≈45 minTheory · 9 min
  2. 2
    Slab S3: bars, laps and meshPaidFoundation≈45 minTheory · 9 min
  3. 3
    Weights, tonnage and the orderPaid≈40 minTheory · 8 min
  4. 4
    Price the reinforcement packagePaid≈40 minTheory · 8 min
  5. 5
    Revision C: re-measure the changePaidFoundation≈50 minChangeTheory · 9 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

You will be able to

Skills checked

  • Work out the cut length of beam bars and links from outside dimensions, BS 8666 shape codes, formers and hook tails, and count links by zone
  • Measure slab bars with cover, spacing and laps, and lay out mesh sheets with their laps
  • Turn lengths into weights with d squared over 162, and net tonnes by bar size into an order quantity with cutting waste
  • Build a rate per net tonne from supply with waste, cut and bend and fixing, and price the package with one overhead and profit markup
  • Re-measure a revised drawing as omission and addition, value it at bill rates and raise the variation order

Videos on this method

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

The certificate is included in the price.

Certificates

Sample: Professional certificate
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties3 records
  • Estimatebill of quantities11 lines
  • Billingcontract

Prices

€79one paymentPrice when sales open

Task 1 is free. Pay only if you want to go on. Start task 1 free

  • All 5 tasks and the professional certificate
  • No subscription, nothing renews
  • No VAT added: the price is the total

Cheaper in the bundle United Arab Emirates: 3 courses for €119 instead of €177

Buy now · €79

Course not as described? We fix it or refund you.

Need a discount? Write to info@datadrivenconstruction.io

How pricing works

What next

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 5Task 1 free, then €79 · 3.5 h of study

Start task 1 free