Task 1 free, then €79Intermediate3 h of studyAustria · Unit-price contract under ÖNORM B 2110
Estimating under ÖNORM B 2061: K3, K7 and a claim for extra costs
About three and a half hours.

Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Final invoice and defects retentionPaidFoundation≈40 minBillingTheory · 10 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
You will be able to
Skills checked
- Work the K3 sheet from the crew's KV wages to Mittellohnkosten and Mittellohnpreis
- Build the K2 Gesamtzuschlag (GGK, Finanzierung, Wagnis, Gewinn) as ERP markups with the right bases
- Price a K7 line from Zeitansatz, Mittellohnpreis and Sonstiges with the Gesamtzuschlag
- Price a Mehrkostenforderung by ÖNORM B 2110 on the bid price basis and file it in the ERP
- Prepare an Abschlagsrechnung and Schlussrechnung with Deckungs- and Haftrücklass and 20 % USt
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.
The certificate is included in the price.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Estimatebill of quantities8 lines
- Billingcontract
- Billingprogress records8 lines
Prices
€79one paymentPrice when sales open
Task 1 is free. Pay only if you want to go on. Start task 1 free
- All 5 tasks and the professional certificate
- No subscription, nothing renews
- No VAT added: the price is the total
Course not as described? We fix it or refund you.
Need a discount? Write to info@datadrivenconstruction.io
How pricing worksWhat next
Questions about this course? Write to info@datadrivenconstruction.io
Christoph Waghubinger (Lewenstein) · CC BY-SA 4.0 · Wikimedia Commons
Related courses

Your roleThe contractor's quantity surveyor
Rebar takeoff and bar bending schedule (UAE, BS 8666)
As the contractor's quantity surveyor you read a beam detail and work out the cut length of each bar by its BS 8666 shape code, measure a slab with laps, cover and mesh sheets.
Intermediate3.5 h of studyFigures checked 24EN
Task 1 free, then €79Professional certificate

Your roleSenior Quantity Surveyor
Interim payment and retention (UAE, FIDIC)
A community centre built under the FIDIC Red Book 2017.
Intermediate2.5 h of studyFigures checked 20EN
Tasks 1–2 free, then €59Professional certificate
- Your roleThe builder
Home renovation: estimate, quote and variations (Australia)
Five tasks, on an invented renovation of a house: a kitchen, a bathroom and a rear room.
Intermediate3 h of studyFigures checked 22EN
Task 1 free, then €79Professional certificate