Task 1 free, then €39Intermediate3 h of studyUnited States
CPM schedule and time extensions (US, AIA A201)
You are the general contractor's project scheduler, the person who plans when each piece of work happens.

Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Abnormal weather and a concurrent delayPaid≈40 minTheory · 12 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
You will be able to
Skills checked
- Work out activity durations from quantities and crew outputs, in working days
- Run the critical path method and read total float; tell the longest path from the longest bar
- Assess an owner change off the critical path: float used, no extension
- Model an owner change on the critical path as a fragnet and state the extension in calendar days (A201 8.1.4)
- Separate abnormal from normal weather (A201 15.1.6.2) and handle a concurrent contractor delay
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.
The certificate is included in the price.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Billingcontract
Prices
€39one paymentPrice when sales open
Task 1 is free. Pay only if you want to go on. Start task 1 free
- All 5 tasks and the professional certificate
- No subscription, nothing renews
- No VAT added: the price is the total
Cheaper in the bundle United States: 6 courses for €229 instead of €334
Buy now · €39Course not as described? We fix it or refund you.
Need a discount? Write to info@datadrivenconstruction.io
How pricing worksWhat next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses
- Your roleEstimator
MEP estimating: electrical and HVAC takeoff and bid (US)
A two-storey outpatient building in Texas.
Intermediate3.5 h of studyFigures checked 18EN
Tasks 1–2 free, then €79Professional certificate

WIP schedule: percent complete and over/under billing (US)
On an invented job: a three-storey building with shops below and apartments above.
Intermediate2 h of studyFigures checked 15EN
Task 1 free, then €39Professional certificate

Your roleGeneral contractor's estimator
Bid leveling: drywall subcontractor bids (US)
Bid a California public school as the general contractor's estimator: record a phoned sub bid as quoted, plug a scope gap, award the leveled low against the machine's rank.
Intermediate1 h of studyFigures checked 9EN
All 4 tasks freeCertificate of completion
