Earned value: is the GMP still safe? (US)

On an invented US job: a five-storey patient tower built by a construction manager at risk under a guaranteed maximum price (GMP).

Workspace: Earned value: is the GMP still safe? (US)
The budget the lender measures you against

Who this course is for

Project controls engineer at the CM at risk — The project and people are invented for training. The rules and contract forms are real.
Your role in the caseProject controls engineer at the CM at risk

The project and people are invented for training. The rules and contract forms are real.

You will be able to

Skills checked

  • Set the performance measurement baseline under a GMP: authorized work in, contingency and fee out
  • Earn value by control account from physical progress, with general conditions as level of effort
  • Correct actual cost with accruals and prepayments so it covers the same work as earned value
  • Forecast the outturn by CPI, read the TCPI and size the overrun beyond the GMP contingency
  • Rebaseline for an approved change and newly found scope without hiding a variance

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: The budget the lender measures you against
  1. 1
    The budget the lender measures you againstFreeFoundation≈10 minTheory · 8 min
  2. 2
    What the October work was worthPaidFoundation≈20 minTheory · 9 min
  3. 3
    Actual cost is not what accounting bookedPaidFoundation≈15 minTheory · 8 min
  4. 4
    The outturn, and whether the contingency covers itPaidFoundation≈20 minTheory · 9 min
  5. 5
    Rev 2: what may move into the baselinePaidFoundation≈20 minTheory · 8 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

Videos on this method

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

The certificate is included in the price.

Certificates

Sample: Professional certificate
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties2 records

Prices

€39one paymentPrice when sales open

Task 1 is free. Pay only if you want to go on. Start task 1 free

  • All 5 tasks and the professional certificate
  • No subscription, nothing renews
  • No VAT added: the price is the total

Cheaper in the bundle United States: 6 courses for €229 instead of €334

Buy now · €39

Course not as described? We fix it or refund you.

Need a discount? Write to info@datadrivenconstruction.io

How pricing works

What next

Next in the learning pathAI-generated programme, verified (Brazil)Intermediate · 3.5 h of study

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

Start free: task 1 of 5Task 1 free, then €39 · 1.5 h of study

Start task 1 free