OpenConstruction Academy
Sign in / Register
EN

Tasks 1–2 free, then €79Intermediate3.5 h of studyBrazil · Public works contract at unit prices

AI-generated programme, verified (Brazil)

Intermediate course, six tasks, on an invented case: a municipal school extension, a public works contract at unit prices under Lei 14.133/2021.

Fictional project · Ampliação da Escola Municipal de Serra Clara

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: The blockwork duration from the composição
  1. 1
    The blockwork duration from the composiçãoFreeFoundation≈15 minTheory · 8 min
  2. 2
    The full programme: render, painting and the draft's logicFreeFoundation≈30 min
  3. 3
    Invented links: the logic the AI made upPaidFoundation≈40 minTheory · 8 min
  4. 4
    Critical path and finish: does it fit the period?PaidFoundation≈35 minTheory · 8 min
  5. 5
    Physical progress: measured, not assumedPaid≈35 minEarned valueTheory · 8 min
  6. 6
    S-curve and cash: the physical-financial programmePaid≈40 minCost reportTheory · 8 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

You will be able to

Skills checked

  • Work an activity's duration from a composição: tradesman's hours over the tradesmen and the 8 h day, rounded up, and spot the old 8,8 h day an AI draft still uses
  • Test every logic link of an AI-drafted programme for a construction reason, remove the invented ones and read total float after recalculating
  • Read the critical path and planned finish in the ERP and count the margin to the contract end date in calendar days under art. 183 of Lei 14.133/2021
  • Record a monthly measurement in the ERP: planned value from the corrected early dates, earned value from the inspector's percentages, physical progress and SPI
  • Build the S-curve and monthly cash of a public works contract with the TCU reference BDI and payment the month after measurement, and find the working capital it needs

Certificate

Awarded when all 6 tasks pass the numbers, trace and explain checks. The free tasks give a progress badge, not the certificate.

The certificate is included in the price.

Certificates

Sample: Professional certificate
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties4 records
  • Billingcontract

Prices

€79one paymentPrice when sales open

Tasks 1–2 are free. Pay only if you want to go on. Start the free tasks

  • All 6 tasks and the professional certificate
  • No subscription, nothing renews
  • No VAT added: the price is the total

Cheaper in the bundle Digital and AI courses: 7 courses for €369 instead of €533

Buy now · €79

Course not as described? We fix it or refund you.

Need a discount? Write to info@datadrivenconstruction.io

How pricing works

What next

Next in the learning pathRisk register, EMV and contingency (UK, ISO 31000)Intermediate · 2 h of study

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Andrevruas · CC BY 3.0 · Wikimedia Commons

Related courses

Start free: task 1 of 6Tasks 1–2 free, then €79 · 3.5 h of study

Start the free tasks