All 5 tasks freeFoundation3 h of studyIndia
Measure to IS 1200 and bill it (India)
A free introductory course of five tasks, about four hours, on an invented Indian case: a teaching block for a central institute, built under the CPWD General Conditions of Contract 2023 on a percentage rate tender.


Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5Recoveries: security deposit, welfare cess, GSTIntermediate≈30 minBillingTheory · 11 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
You will be able to
Skills checked
- Measure brickwork to IS 1200 (Part III): gross area, openings over 0.1 m2 deducted, volume net of RCC lintels
- Measure plaster to IS 1200 (Part XII): the 0.5 m2 and 3 m2 bands, one face or both, jambs and soffits above 3 m2
- Price an abstract at schedule-of-rates base rates with a station cost index and a percentage rate tender quote
- Build the first running account bill under CPWD GCC 2023 clauses 6 and 7 and test it against the Schedule 'F' minimum
- Split GST out of tax-inclusive tendered rates (clauses 33 and 34) and reach the taxable value
- Take out the Clause 1A security deposit, the welfare cess and GST TDS to the amount actually payable
Videos on this method
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties3 records
- Billingcontract
- Estimatebill of quantities7 lines
What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses

Rate analysis to CPWD practice (India)
The detailed estimate of a primary health centre, priced the way the CPWD (Central Public Works Department) does it.
Foundation2.5 h of studyFigures checked 15EN
All 4 tasks freeCertificate of completion

Your roleFit-out estimator at the tenant's project management consultant (office interiors)
Office fit-out: measure, price and budget with GST (India)
You are the fit-out estimator at the tenant's project management consultant.
Intermediate1 h of studyFigures checked 8EN
All 4 tasks freeCertificate of completion

Your roleJunior estimator
Quantity bill and КСС (Bulgaria)
A school being renovated so that it uses less energy.
Foundation2 h of studyFigures checked 23BG
All 5 tasks freeCertificate of completion




