Rate analysis to CPWD practice (India)
A free course of four tasks, about two and a half hours, on an invented Indian case: the detailed estimate of a primary health centre, priced the way the CPWD (Central Public Works Department) does it.

Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4Schedule items with the cost index, analysed items withoutAdvanced≈35 minTheory · 10 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
You will be able to
Skills checked
- Price a rate analysis sheet written for 10 m3 (materials, carriage for the lead, labour, sundries) and reduce it to the rate per m3
- Add 1 % water charges and then 15 % contractor's profit and overheads on W plus water, in the CPWD order
- Analyse RCC M25 with plant and labour while keeping reinforcement as its own item, measured in kg from the bar bending schedule
- Bring schedule base rates to the station with a cost index while non-schedule items stay at market rates
- Assemble and check a detailed estimate total before GST
Videos on this method
Certificate
Awarded when all 4 tasks pass the numbers, trace and explain checks.

Files you work with
Created in your OpenConstructionERP workspace the moment you enrol.
- parties2 records
- Estimatebill of quantities6 lines
What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses

Measure to IS 1200 and bill it (India)
A teaching block for a central institute, built under the CPWD General Conditions of Contract 2023 on a percentage rate tender.
Foundation3 h of studyFigures checked 20EN
All 5 tasks freeCertificate of completion

Your roleJunior estimator
Quantity bill and КСС (Bulgaria)
A school being renovated so that it uses less energy.
Foundation2 h of studyFigures checked 23BG
All 5 tasks freeCertificate of completion

Your roleEstimator
Bill of quantities to first variation order (Germany, VOB)
About four hours.
Foundation2 h of studyFigures checked 30DE
All 5 tasks freeCertificate of completion