Úvod do kurzu · 3 min

Kalkulace TZB: výkaz výměr elektro a HVAC, ocenění a nabídka (USA)

Harwick Medical Office · Two-storey outpatient building, Texas · Smyšlený projekt

You are the estimator at the mechanical, electrical and plumbing (MEP) subcontractor, the firm that installs the building's services: you work out what the job will cost and what to bid. In six tasks you take a medical office in Texas from the drawings to a lump-sum bid, one fixed price for the whole MEP package, to the general contractor (GC), then price the first change order after the award.

Začít úlohu 1

Building
Two-storey medical office, 24,000 sf
Contract
Lump-sum MEP subcontract to the general contractor (one fixed price)
Story
March to July 2026
Práce v ERP
Úlohy: 6, asi 3 h 37 min

Kdo komu co předává

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Přichází k vám

  • General contractorGeneral contractor
    • Drawings and bid formÚloha 1
    • Bulletin 2, answering RFI 14Úloha 6
  • Controls and balancing firmsYour sub-subcontractors
    • Quotes, tax already inÚloha 5
VyEstimator, MEP subcontractor

Odchází od vás

    • MEP bidÚloha 5
    • Change orderÚloha 6
    General contractorReceives your price
    • Labor hours they are budgetedÚloha 3
    Your field crewsElectricians, sheet metal, pipefitters

Vaše cesta zakázkou

Four tasks turn drawings into quantities and direct cost, one builds the bid, one prices a change after the award. Start with task 1: in the Bill of Quantities you count the devices on the Level 1 electrical plan; task 2 measures conduit and wire for one circuit.

  1. Takeoff and pricing

    Úloha 1 · 12 min

    Výkaz výměr elektro: spočítejte zařízení

    Výstup
    Device counts for the exam wing
    Dokument
    Level 1 electrical plan, exam wing
    V ERP
    Bill of Quantities
  2. Takeoff and pricing

    Úloha 2 · 25 min

    Výkaz výměr elektro: trubka a vodiče pro obvod A-7

    Výstup
    Conduit and wire for one circuit
    Dokument
    Circuit A-7 runs and heights
    V ERP
    Bill of Quantities
  3. Takeoff and pricing

    Úloha 3 · 45 min

    Oceňte elektroinstalaci pomocí směrných pracností

    Výstup
    Electrical unit rates and the labor hours
    Dokument
    Labor units (hours per item) and the crew rate
    V ERP
    Bill of Quantities
  4. Takeoff and pricing

    Úloha 4 · 45 min

    Vzduchotechnické potrubí: hmotnost podle tloušťky plechu

    Výstup
    Supply trunk weight and its price
    Dokument
    Duct layout, trunk TR-1
    V ERP
    Bill of Quantities
  5. The bid

    Úloha 5 · 50 min

    Sestavte nabídku TZB: mzdové odvody, daň, přirážky, garance

    Výstup
    The bid price to the general contractor
    Dokument
    Bid terms, tax rule, quotes from sub-subcontractors
    V ERP
    Bill of Quantities, Markups
  6. After award

    Úloha 6 · 40 min

    Oceňte změnový příkaz z RFI 14

    Výstup
    The change order, approved and completed
    Dokument
    Bulletin 2 and the change terms
    V ERP
    Variations

How a drawing becomes a bid

Each step below is one task, in the order the money is built. Task 4 does for the ductwork what tasks 1 to 3 do for the electrical.

Counts and lengths
Úloha 1QuantitiesCount devices (outlets, switches, lights), measure conduit, the pipe the wire runs in, with its rise and drops, then wire.
MaterialLabor at base wage
Úloha 3Direct costHours times crew rate, plus material, line by line.
Overhead, profit, bondBurden, tools, taxMaterialLabor
Úloha 5Bid priceBurden (payroll taxes and insurance), tools and tax as lines; overhead, profit and bond on top, in order.
Change orderBid price
Úloha 6Change orderAdds less deducts at bid rates, then the change terms once.

Modře je to, co úloha přidává; šedě to, co se přenáší z dřívějška.

Stručně. Hours are not dollars. Each layer has its own base. Net the change before you mark it up.