Úvod do kurzu · 3 min
Kalkulace TZB: výkaz výměr elektro a HVAC, ocenění a nabídka (USA)
Harwick Medical Office · Two-storey outpatient building, Texas · Smyšlený projekt
You are the estimator at the mechanical, electrical and plumbing (MEP) subcontractor, the firm that installs the building's services: you work out what the job will cost and what to bid. In six tasks you take a medical office in Texas from the drawings to a lump-sum bid, one fixed price for the whole MEP package, to the general contractor (GC), then price the first change order after the award.
- Building
- Two-storey medical office, 24,000 sf
- Contract
- Lump-sum MEP subcontract to the general contractor (one fixed price)
- Story
- March to July 2026
- Práce v ERP
- Úlohy: 6, asi 3 h 37 min
Kdo komu co předává
Every arrow is a document that reaches your desk or leaves it, and the task where that happens.
Přichází k vám
- General contractorGeneral contractor
- Drawings and bid formÚloha 1
- Bulletin 2, answering RFI 14Úloha 6
- Controls and balancing firmsYour sub-subcontractors
- Quotes, tax already inÚloha 5
Odchází od vás
- MEP bidÚloha 5
- Change orderÚloha 6
- Labor hours they are budgetedÚloha 3
Vaše cesta zakázkou
Four tasks turn drawings into quantities and direct cost, one builds the bid, one prices a change after the award. Start with task 1: in the Bill of Quantities you count the devices on the Level 1 electrical plan; task 2 measures conduit and wire for one circuit.
Takeoff and pricing
Úloha 1 · 12 min
Výkaz výměr elektro: spočítejte zařízení
- Výstup
- Device counts for the exam wing
- Dokument
- Level 1 electrical plan, exam wing
- V ERP
- Bill of Quantities
Takeoff and pricing
Úloha 2 · 25 min
Výkaz výměr elektro: trubka a vodiče pro obvod A-7
- Výstup
- Conduit and wire for one circuit
- Dokument
- Circuit A-7 runs and heights
- V ERP
- Bill of Quantities
Takeoff and pricing
Úloha 3 · 45 min
Oceňte elektroinstalaci pomocí směrných pracností
- Výstup
- Electrical unit rates and the labor hours
- Dokument
- Labor units (hours per item) and the crew rate
- V ERP
- Bill of Quantities
Takeoff and pricing
Úloha 4 · 45 min
Vzduchotechnické potrubí: hmotnost podle tloušťky plechu
- Výstup
- Supply trunk weight and its price
- Dokument
- Duct layout, trunk TR-1
- V ERP
- Bill of Quantities
The bid
Úloha 5 · 50 min
Sestavte nabídku TZB: mzdové odvody, daň, přirážky, garance
- Výstup
- The bid price to the general contractor
- Dokument
- Bid terms, tax rule, quotes from sub-subcontractors
- V ERP
- Bill of Quantities, Markups
After award
Úloha 6 · 40 min
Oceňte změnový příkaz z RFI 14
- Výstup
- The change order, approved and completed
- Dokument
- Bulletin 2 and the change terms
- V ERP
- Variations
How a drawing becomes a bid
Each step below is one task, in the order the money is built. Task 4 does for the ductwork what tasks 1 to 3 do for the electrical.
Modře je to, co úloha přidává; šedě to, co se přenáší z dřívějška.
Stručně. Hours are not dollars. Each layer has its own base. Net the change before you mark it up.