Introducere în curs · 3 min

Devizul MEP: extragerea cantităților electrice și HVAC, prețuirea și oferta (SUA)

Harwick Medical Office · Two-storey outpatient building, Texas · Proiect fictiv

You are the estimator at the mechanical, electrical and plumbing (MEP) subcontractor, the firm that installs the building's services: you work out what the job will cost and what to bid. In six tasks you take a medical office in Texas from the drawings to a lump-sum bid, one fixed price for the whole MEP package, to the general contractor (GC), then price the first change order after the award.

Începe sarcina 1

Building
Two-storey medical office, 24,000 sf
Contract
Lump-sum MEP subcontract to the general contractor (one fixed price)
Story
March to July 2026
Lucru în ERP
6 sarcini, circa 3 h 37 min

Cine ce predă cui

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Ajunge la tine

  • General contractorGeneral contractor
    • Drawings and bid formSarcina 1
    • Bulletin 2, answering RFI 14Sarcina 6
  • Controls and balancing firmsYour sub-subcontractors
    • Quotes, tax already inSarcina 5
TuEstimator, MEP subcontractor

Pleacă de la tine

    • MEP bidSarcina 5
    • Change orderSarcina 6
    General contractorReceives your price
    • Labor hours they are budgetedSarcina 3
    Your field crewsElectricians, sheet metal, pipefitters

Traseul tău prin proiect

Four tasks turn drawings into quantities and direct cost, one builds the bid, one prices a change after the award. Start with task 1: in the Bill of Quantities you count the devices on the Level 1 electrical plan; task 2 measures conduit and wire for one circuit.

  1. Takeoff and pricing

    Sarcina 1 · 12 min

    Extragerea cantităților electrice: numărați dispozitivele

    Produci
    Device counts for the exam wing
    Document
    Level 1 electrical plan, exam wing
    În ERP
    Bill of Quantities
  2. Takeoff and pricing

    Sarcina 2 · 25 min

    Extragerea cantităților electrice: tubul și conductorii circuitului A-7

    Produci
    Conduit and wire for one circuit
    Document
    Circuit A-7 runs and heights
    În ERP
    Bill of Quantities
  3. Takeoff and pricing

    Sarcina 3 · 45 min

    Prețuiți partea electrică cu norme de manoperă

    Produci
    Electrical unit rates and the labor hours
    Document
    Labor units (hours per item) and the crew rate
    În ERP
    Bill of Quantities
  4. Takeoff and pricing

    Sarcina 4 · 45 min

    Tubulatura de aer: greutatea pe grosimea tablei

    Produci
    Supply trunk weight and its price
    Document
    Duct layout, trunk TR-1
    În ERP
    Bill of Quantities
  5. The bid

    Sarcina 5 · 50 min

    Construiți oferta MEP: cheltuieli salariale, taxă, adaosuri, garanție

    Produci
    The bid price to the general contractor
    Document
    Bid terms, tax rule, quotes from sub-subcontractors
    În ERP
    Bill of Quantities, Markups
  6. After award

    Sarcina 6 · 40 min

    Prețuiți modificarea de contract din RFI 14

    Produci
    The change order, approved and completed
    Document
    Bulletin 2 and the change terms
    În ERP
    Variations

How a drawing becomes a bid

Each step below is one task, in the order the money is built. Task 4 does for the ductwork what tasks 1 to 3 do for the electrical.

Counts and lengths
Sarcina 1QuantitiesCount devices (outlets, switches, lights), measure conduit, the pipe the wire runs in, with its rise and drops, then wire.
MaterialLabor at base wage
Sarcina 3Direct costHours times crew rate, plus material, line by line.
Overhead, profit, bondBurden, tools, taxMaterialLabor
Sarcina 5Bid priceBurden (payroll taxes and insurance), tools and tax as lines; overhead, profit and bond on top, in order.
Change orderBid price
Sarcina 6Change orderAdds less deducts at bid rates, then the change terms once.

Albastru este ce adaugă sarcina; gri este ce vine de dinainte.

Pe scurt. Hours are not dollars. Each layer has its own base. Net the change before you mark it up.