MEP-kalkylering: elektrisk och VVS-mängdavtagning, prissättning och anbudet (USA)

Harwick Medical Office · Two-storey outpatient building, Texas · Fiktivt projekt

You are the estimator at the mechanical, electrical and plumbing (MEP) subcontractor, the firm that installs the building's services: you work out what the job will cost and what to bid. In six tasks you take a medical office in Texas from the drawings to a lump-sum bid, one fixed price for the whole MEP package, to the general contractor (GC), then price the first change order after the award.

Starta uppgift 1

Building
Two-storey medical office, 24,000 sf
Contract
Lump-sum MEP subcontract to the general contractor (one fixed price)
Story
March to July 2026
Arbete i ERP
6 uppgifter, cirka 3 h 37 min

Vem lämnar vad till vem

Every arrow is a document that reaches your desk or leaves it, and the task where that happens.

Kommer till dig

  • General contractorGeneral contractor
    • Drawings and bid formUppgift 1
    • Bulletin 2, answering RFI 14Uppgift 6
  • Controls and balancing firmsYour sub-subcontractors
    • Quotes, tax already inUppgift 5
DuEstimator, MEP subcontractor

Går från dig

    • MEP bidUppgift 5
    • Change orderUppgift 6
    General contractorReceives your price
    • Labor hours they are budgetedUppgift 3
    Your field crewsElectricians, sheet metal, pipefitters

Din väg genom projektet

Four tasks turn drawings into quantities and direct cost, one builds the bid, one prices a change after the award. Start with task 1: in the Bill of Quantities you count the devices on the Level 1 electrical plan; task 2 measures conduit and wire for one circuit.

  1. Takeoff and pricing

    Uppgift 1 · 12 min

    Elmängdning: räkna apparaterna

    Du tar fram
    Device counts for the exam wing
    Dokument
    Level 1 electrical plan, exam wing
    I ERP
    Bill of Quantities
  2. Takeoff and pricing

    Uppgift 2 · 25 min

    Elmängdning: rör och ledning för krets A-7

    Du tar fram
    Conduit and wire for one circuit
    Dokument
    Circuit A-7 runs and heights
    I ERP
    Bill of Quantities
  3. Takeoff and pricing

    Uppgift 3 · 45 min

    Prissätt elen med arbetstidsnormer

    Du tar fram
    Electrical unit rates and the labor hours
    Dokument
    Labor units (hours per item) and the crew rate
    I ERP
    Bill of Quantities
  4. Takeoff and pricing

    Uppgift 4 · 45 min

    Ventilationskanaler: vikt efter plåttjocklek

    Du tar fram
    Supply trunk weight and its price
    Dokument
    Duct layout, trunk TR-1
    I ERP
    Bill of Quantities
  5. The bid

    Uppgift 5 · 50 min

    Bygg MEP-anbudet: lönebikostnader, skatt, påslag, borgen

    Du tar fram
    The bid price to the general contractor
    Dokument
    Bid terms, tax rule, quotes from sub-subcontractors
    I ERP
    Bill of Quantities, Markups
  6. After award

    Uppgift 6 · 40 min

    Prissätt ändringsordern utifrån RFI 14

    Du tar fram
    The change order, approved and completed
    Dokument
    Bulletin 2 and the change terms
    I ERP
    Variations

How a drawing becomes a bid

Each step below is one task, in the order the money is built. Task 4 does for the ductwork what tasks 1 to 3 do for the electrical.

Counts and lengths
Uppgift 1QuantitiesCount devices (outlets, switches, lights), measure conduit, the pipe the wire runs in, with its rise and drops, then wire.
MaterialLabor at base wage
Uppgift 3Direct costHours times crew rate, plus material, line by line.
Overhead, profit, bondBurden, tools, taxMaterialLabor
Uppgift 5Bid priceBurden (payroll taxes and insurance), tools and tax as lines; overhead, profit and bond on top, in order.
Change orderBid price
Uppgift 6Change orderAdds less deducts at bid rates, then the change terms once.

Blått är det uppgiften lägger till; grått följer med från tidigare.

Kort sagt. Hours are not dollars. Each layer has its own base. Net the change before you mark it up.