Hold points and non-conformance reports (UK)

Work as the contractor's quality manager on a health centre build after the first-floor slab was poured before its reinforcement hold point was released: record the failed inspection, raise and grade the NCR from a cover survey, find the root cause and the programme delay, price the rework, then re-inspect, settle the repeat-test cost under NEC4 and close the NCR.

Workspace: Hold points and non-conformance reports (UK)
A pour past an unreleased hold point

Who this course is for

Contractor's quality manager — The project and people are invented for training. The rules and contract forms are real.
Your role in the caseContractor's quality manager
Main contractor — The project and people are invented for training. The rules and contract forms are real.
The company in the caseMain contractor

The project and people are invented for training. The rules and contract forms are real.

You will be able to

Skills checked

  • Record a pour past an unreleased hold point as a failed inspection and size the concrete in doubt
  • Raise an NCR and grade its severity from a cover survey against the acceptance limit
  • Record the root cause and count the working days a critical activity loses
  • Price the full cost of a nonconformity and charge the repeat test under NEC4 clause 41.6

Tasks

A task as it opens in the trainer, before you enter anything.

Task 1 as it opens in the trainer: A pour past an unreleased hold point
  1. 1
    A pour past an unreleased hold pointFoundation≈10 minInspectionTheory · 8 min
  2. 2
    NCR-001 and the cover surveyFoundation≈15 minTheory · 9 min
  3. 3
    Root cause, and what it does to the programmeFoundation≈20 minTheory · 9 min
  4. 4
    The cost of putting it rightFoundation≈20 minTheory · 8 min
  5. 5
    Re-inspect, pay for the repeat test, close NCR-001Foundation≈15 minInspectionTheory · 7 minCheat sheet: every rule on one page

Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.

Certificate

Awarded when all 5 tasks pass the numbers, trace and explain checks.

Certificates

Sample: Certificate of completion
Sample issued to a fictitious learner. Your certificate shows your name, the course, the date and its own ID.
Check this sample

Files you work with

Created in your OpenConstructionERP workspace the moment you enrol.

  • parties4 records
  • Billingcontract

Start free course All courses

What next

Next in the learning pathProgramme and critical path (UK)Intermediate · 2.5 h of study

When you pass, add the certificate to LinkedIn from your account. Anyone can open its verification link, no sign-in needed. How to add it

Questions about this course? Write to info@datadrivenconstruction.io

Related courses

  • Your roleContractor's commercial manager (quantity surveyor)

    Interim payment assessment (UK, NEC4 Option B)

    Price an NEC4 Option B assessment on a health centre new build: the Y(UK)2 and Construction Act timetable, the Price for Work Done to Date with X16 retention, pay less notices and VAT.

    Intermediate2 h of studyFigures checked 14EN

    All 4 tasks freeCertificate of completion

  • Your roleContractor's BIM coordinator (information manager)

    BIM coordination and clash detection (UK, ISO 19650)

    Coordinate a health centre's design models the ISO 19650 way: choose what goes into the federated model, set clash runs from the BEP clash matrix, triage hard and clearance clashes and duplicates.

    Intermediate2 h of studyFigures checked 12EN

    All 4 tasks freeCertificate of completion

  • Your roleSustainability / cost consultant preparing an upfront carbon estimate

    Upfront carbon A1-A5 (UK)

    Estimate the upfront carbon A1-A5 of a new health centre's frame, slabs and walls, and use it to decide: which wall swap cuts carbon per m², which nearer supplier cuts transport most.

    Intermediate2 h of studyFigures checked 18EN

    All 5 tasks freeCertificate of completion

Start free: task 1 of 5All 5 tasks free · 1.5 h of study

Start free course