All 5 tasks freeAdvanced1.5 h of studyInternational
Handover: O&M data, defects and retention release
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Who it's for Site manager

You will be able to
Skills checked
- Assemble the O&M and as-built package and measure its completeness from accepted documents only (FIDIC 10.1, ISO 19650-3)
- Check component asset data against the client's asset information requirements before it is loaded (ISO 19650-3)
- Sort open punch items into those that stop taking-over and minor work listed in the Taking-Over Certificate (FIDIC 10.1)
- Run the Defects Notification Period register and test each defect against its own remedy date (FIDIC 11.1, 11.4)
- Release both halves of the Retention Money, less the Engineer's determination for a defect remedied by others (FIDIC 14.9)
Tasks
A task as it opens in the trainer, before you enter anything.

- 1
- 2
- 3
- 4
- 5The two halves of the Retention MoneyFoundation≈15 minTheory · 8 minCheat sheet: every rule on one page
Difficulty is calculated from the steps and the figures you check in each task. Time is the median of real learners once enough have finished; until then it is the author's estimate.
Certificate
Awarded when all 5 tasks pass the numbers, trace and explain checks.

What next
Questions about this course? Write to info@datadrivenconstruction.io
Related courses
Your roleContractor's quantity surveyorCost control at month 6: earned value and CVR
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Advanced1.5 h of studyFigures checked 13EN
All 5 tasks freeCertificate of completion
Your roleSite surveyorLand parcels: boundary, area, overlap, split and register
On a fictional development plot of about 2.4 ha.
Intermediate2 h of studyFigures checked 10EN
All 5 tasks freeCertificate of completion
Your roleSite managerSite diary and daily reports as contract records
On a fictional six-storey mixed-use building under a FIDIC Red Book contract.
Foundation1.5 h of studyFigures checked 12EN
All 5 tasks freeCertificate of completion